Search Permits
17,050 results · type: electrical
ELECTRICAL VEHICLE CHARGING STATION
SOLAR PV WITH ESS
vacancy inspection
Vacancy permit. Power has been off for more than 6 months. NO ELECTRICAL WORK UNDER THIS PERMIT. THIS PERMIT IS FOR THE PURPOSES OF AN ELECTRICAL VANCANCY FOR 4328 BAUDIN ST.
Upgrade meter pan and two disconnects 200 amps
Replace damaged underground conduit from Entergy pull box to meter. Emergency reconnect needed 200amps
Run dedicated circuit for EV Charger Install
Service upgrade. Original panel is a fuse type. Will replace meter and service head 125 amp panel for 3427 Republic St
Install 100 amp service with 14 circuit
Repairs to Service equipment, reconnect. Repairs to meter pan; relocatiing meter pan; update ground system.
electrical
electrical
Addition and/or Alteration
Addition and/or Alteration
Addition and/or Alteration
Addition and/or Alteration
Addition and/or Alteration
Addition and/or Alteration
Addition and/or Alteration
New Construction
Addition and/or Alteration
Addition and/or Alteration
Addition and/or Alteration
Addition and/or Alteration
Addition and/or Alteration
Addition and/or Alteration
Addition and/or Alteration
PERMIT IS ONLY FOR INSTALLATION OF ONE TESLA POWERWALL 3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEES
Residential Electrical Repair Like for Like-no plans required. Installation shall comply with City of Mesa codes and servicing electric utility requirements. DO NOT DISCONNECT UTILITY WIRES OR METERS. Schedule disconnect/reconnect with serving utility and obtain utility service requirements specific to your permit. Replace the existing 200amp 30space SES with a new 200amp 40 space SES.
Installation of 200 Amp electric service - no plans required. Installation shall comply with City of Mesa codes and servicing electric utility requirements. DO NOT DISCONNECT UTILITY WIRES OR METERS. Schedule disconnect/reconnect with serving utility and obtain utility service requirements specific to your permit