Search Permits
18,687 results · type: plumbing
BLDG 1: New pool accessory to bldg 1 w/ plumbing permit
add outside spigot
Cap off water & wastewater Total demo of duplex 2200 sq ft circa 1966 ***The building shall not be demolished until after the contractor has fulfilled the neighbor notification requirements outlined in Steps 5 & 6 of the Demolition webpage. ***
Replacement of an existing water heater Replacement of Tankless Water Heater Like for Like
Express: Tub to shower conversion
Replacement of an existing water heater
Interior Remodel Full interior remodel structural changes plumbing changes electrical changes replacing/adding windows and doors new floors new paint etc partial demo to unpermitted covered patio
New Construction SFR 2609 sq.ft. ETJ
Installing a new irrigation system
Express - Tub to shower conversion. Rewiring of branch circuitry for three rooms Revision-Mechanical and plumbing work
Installation of the onsite fire line piping REF: SP-2021-0447C
Cap off for water & wastewater Total demo of sfr 1973 sqft circa 1957
2026-030442 BP Cap sewer line 5 from property line/tap line is located left side of property at 1109 E 52nd st
Dawson S351 D Left New - 1 Story SFR w/ 3 bedrooms 2 bathrooms attached 2 car garage covered entry porch and patio required parking: 2.
Harrison S356 B Right New - 2 Story SFR w/ 5 bedrooms 3 bathrooms attached 2 car garage covered entry porch and patio required parking: 2.
Remodel kitchen by replacing cabinets and counters window over sink and removing 1 interior kitchen wall to expand the kitchen. In the master bathroom replace the tub and shower. On the stairs replace the treads and railing. For remainder of house replace flooring trim around fireplace and paint. Install new recessed can lights in kitchen living room foyer closet/pantry and bathroom.
Plumbing Permits
Plumbing Permits
Plumbing Permits
Plumbing Permits
Plumbing Permits
Plumbing Permits
Converting tub to shower, replacing pan, drain, and valves. No structural changes with this permit.
Converting tub to tub at existing SFR. Using a shower rod or glass door. No structural changes.
Master bath: Tub-to-shower conversion with 60x32 low-profile preformed shower base (center drain), no drain relocation, no structural changes, shower replacement, surround installation, plumbing replacement, fixture replacement, flooring and baseboard replacement, toilet removal and reinstall where applicable. Guest bath: Tub-to-shower conversion with 60x32 low-profile bathtub (left drain), no drain relocation, no structural changes, shower/tub replacement, surround installation, plumbing replac
plumbing
plumbing
plumbing
plumbing
Herewith filed plumbing work for an enlargement and conversion of a 2-story 2-family building.