Search Permits
11,965 results · type: mechanical
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
Mechanical Electrical and plumbing infrastructure replacement of existing equipment that has passed its service life. Work to be performed in Electrical and Mechanical rooms across the existing building in multiple Mechanical rooms
New construction of a single-family residence. *Please reference approved PUD C8-2018-0171.2B.SH.
7 DAY - Minor interior renovations to an existing medical office. - OVA
Replacement of complete existing central heat and air system with or without duct work REPLACE EXISTING HVAC SYSTEM
Replacement of complete existing central heat and air system with or without duct work
ePlan: Residential Expedited Review - New construction of a 2-Story Single Family Res. [4bed 4.5bath] with Attached Carport and Autofill Pool. 7012 YATES AVE
Replacement of complete existing central heat and air system with or without duct work
RESIDENTIAL - FAU AND AC CHANGE OUT
RESIDENTIAL - FAU AND AC CHANGE OUT
Installation of a 22kw whole home natural gas generator & 200amp transfer switch - EGEN applied for - REF Code: 8174SX
Installation of a 24kw whole home natural gas generator & 200amp transfer switch - EGEN applied for - Ref Code: 1FVHQX
Install a new 40-gallon electric water heater
Install a new 40-gallon electric water heater.
Replace 3 ton condenser, furnace and evap coil
Replace 3.5 ton condenser, furnace and evaporator coil.
Replace 3 ton air handler
Replace 3 ton condenser and air handler
Installation of a gas line for natural gas generator - EGEN applied for - reference code: AXAPPA
Replace 3 ton condenser, furnace and evap coil
Replace 3 ton condenser and air handler
Replace 3 ton air handler
6 month vacancy gas inspection
Installation of 2- 3 ton system and 1- 2 ton system, and ductwork
1- Electric Water heater
Install 4 ton air handler and condenser with 15 kw heat strip and new ducts.
mechanical
INSTALLATION OF TEMPORARY OVERHEAD PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
INSTALLATION OF TEMPORARY ROOF PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY SHALL COMPLY WITH CHAPTER#33 OF 2022 THE NY BUILDING CODE.