Search Permits
200,167 results
ePlan: Expedited Review - New Construction of Boat Dock an Amenity Lounge.
Service upgrade from 1 to 2 meters to service original address plus bldg. 2 2502 E 9th Street & Bldg. Service upgrade located on 2502 E. 9th Street not on Bldg. 2. reference building permit 2024-155770 BP
Total demo of SFR 2400 sq ft circa 1968 ***The building shall not be demolished until after the contractor has fulfilled the neighbor notification requirements outlined in Steps 5 & 6 of the Demolition webpage.***
ePlan Review: Office Remodel 2nd Floor Suite 200
2026-039066 PP (PER PLUMBING PERMIT) ELECTRICAL PERMIT REQUIRED FOR NEW RECEPTACLE AND CABLE INSTALLED
ePlan: Expedited Review - New Construction of Clubhouse - Lake Clubhouse.
Replacement of complete existing central heat and air system with or without duct work
ePlan: Residential Expedited Review - Interior Remodel to Existing 2-Story Single Family Res with basement replace windows and doors replace all mechanical plumbing and electrical fixtures to be replaced interior walls to be demolished/relocated remodeling half bath to full bath
Unit 1B: New construction three-unit use duplex residential: Unit 1B: 3 bedroom 3 bath.
Express: Shower pan and valve replacement
ePlan: Expedited Review - New Construction of Pergola - Residential Units.
Install UG fed Construction loop to maintain irrigation run construction trailer. Attach to building permit # 2026-058517
Replacement of complete existing central heat and air system with or without duct work 4ton 2stage Gas system replacement
Replacement of complete existing central heat and air system with or without duct work Install replacement of 3 Ton Heat Pump System
Replacement of complete existing central heat and air system with or without duct work Removed the old unit and installed 1 new HVAC system without ductwork
ePlan: Expedited Review - New Construction of Logistics Building.
ePlan: Expedited Review - New Construction of Pergola - Residential Units.
CHANGE OF USE from Retail/Office to Restaurant and Interior Buildout for Suite 112 2024 052094 DA - Concurrent Review
Homebuilders loop for New SFR ref 2026-070398 BP. Austin LTD -PEC
PB: New construction of 1 story sfr - 3 beds 2 baths 2 car garage and covered patio
ePlan: Expedited Review - New Athletic Center and Spa.
ePlan: Expedited Review - New Construction of a Multi-Story Mixed Use Multi-Family Bldg. with Parking Garage - Lake View East - Module O.
Replacement of complete existing central heat and air system with or without duct work Install replacement of 2.5 Ton AC System and Repair Or Rebuild Of The Supply Air Plenum
*SMART Housing* *Green Building* New 2-story 3 bedroom 2.5 bathroom rowhouse with covered front porch.
ePlan: Residential Expedited Review - SITE PLAN APPROVED: PHASE A - Greystar Plan A577 New 2 story SFR with 4 Bedrooms 3.5 Bath and an attached 2 car garage. FOR RECORD SET SEE: 8002 PONCHO PASS 2025-070719 PR (INCLUDES 23 ADDRESSES.)
1 access hole on the left side with a spot repair on the main sewer line under the home.
2 access holes inside the home 1 in each bathroom with repairs on the master toilet and secondary toilet
Construct new driveway approach of 17 FT and sidewalk of 33 LF
Install new water service in yard. (50 ft of waterline). Replace all interior water lines ( approximately 120 ft of pipe). No tunneling. Roughly 10 square feet of drywall removed for access.
Installing a new irrigation system