Search Permits
11,965 results · type: mechanical
INSTALLATION OF ENGINEERED ENCLOSURE AS PER PLANS. TEMPORARY EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Mechanical work as shown on plans
INSTALLATION OF TEMPORARY OVERHEAD PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
A construction platform to support scaffolding at the exterior of the building.
INSTALLATION OF TEMPORARY ROOF PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SHALL COMPLY WITH CHAPTER#33 OF 2022 NYC BUILDING CODE.
Installation Of Temporary Material Hoists As per Plans Submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Installation of a temporary Engineered Enclosure System per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
INSTALLATION OF TEMPORARY ENGINEERED ENCLOSURE SYSTEM AS PER PLANS. TEMPORARY EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
This application is being filed for the mechanical work at the subject premises as per plans submitted herewith. No change in use, egress or occupancy under this application.
Mechanical means will assist with demolition of structure
INSTALLATION OF TEMPORARY ENGINEERED ENCLOSURE SYSTEM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY
Mechanical work on the 31st floors as indicated on drawings.
MECHANICAL MODIFICATIONS TAKING PLACE ON 14TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Modification of mechanical systems as per plans filed herewith. No change in use, occupancy or egress.
Modifications to existing HVAC system and related piping including installation of AC units. No change in use, egress or occupancy.
Installation of new non-emergency gas generator on the roof. No change in use, egress or occupancy.
INTERIOR RENOVATION IN EXISTING (3) THREE STORY WITH BASEMENT AND CELLAR, (2) TWO-FAMILY BUILDING WITH MECHANICAL WORK. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION.
Interior renovation of 2nd floor including relocate bathroom door, add exhaust fan and heated flooring. No change to use, egress or occupancy.
RENOVATION OF EXISTING COMMERCIAL SPACE ON 1st FLOOR ONLY: INSTALL NEW PARTITIONS, FLOOR/WALL FINISHES. INSTALL NEW ADA TOILET AS PER PLAN.MECHANICAL WORK FOR EXHAUST HOOD IN EXISTING COMMERCIAL SPACE IN THE 1ST FLOOR AS PER PLAN. NO CHANGE IN USE, EGRESS
INSTALLATION OF EMERGENCY GENERATOR WITH FUEL STORAGE.
DESIGN INCLUDES REPLACING THE CHILLED WATER COIL INSIDE AN AC UNIT. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS FILING.
PROPOSED TWO-FAMILY DWELLING WITH ACCESSORY OPEN OFF-STREET PARKING FOR TWO CARS.
INSTALL DEBRIS CHUTE AS PER PLAN IN CONJUNCTION WITH BUILDING DEMOLITION
SPEAR - INSTALLATION OF HAVC DUCTWORK AND AC UNITS.
MECHANICAL WORK FOR RENOVATIONS OF THE 9TH FL APARTMENT AS PER PLANS FILED HEREWITH.
INSTALLATION OF TEMPORARY BETAMAX HOIST AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Replacement of existing Heat Pump A/C equipment. Modify ductwork layout. No change to use, egress or occupancy.
Installation of (1) ceiling ducted packaged heat pump unit to serve building lobby.
Mechanical work for landlord rennovation at this locaiton. No change in use, egress, or occupancy under this application.
horizontal extent 2 story in the rear of existing one family, including structural, foundation, mechanical work, required new c of o for two family