Search Permits
18,284 results · type: plumbing
bathroom reconfiguration, add clothing washer
PROPOSED INTERIOR RENOVATION OF EXISTING FLOOR. PLUMBINGWORK AS PER PLAN. NO CHANGE IN USE EGRESS OR OCCUPANCY
Proposed water, sanitary sewer, and storm in OSP, GF and 1st FL to connect the new modular residence to city lines. The modular residence is under NYS Jurisdiction (see GC approved plans).
Proposed water, sanitary sewer, and storm in OSP, GF and 1st FL to connect the new modular residence to city lines. The modular residence is under NYS Jurisdiction (see GC approved plans).
SUBSEQUENT FILING FOR PLUMBING WORK. INSTALL KITCHEN, BATHROOM, & BOILER ROOM. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
PLUMBING WORK ON CEL, 1ST & 2ND FLOOR. NO CHANGE IN USE GROUP, EGRESS AND OCCUPANCY. (TOTAL: EXISTING TWO FAMILY DWELLING UNITS UNDER CO#27602/1924.)
FILE PLUMBING WORK IN EXISTING LAUNDROMAT TO REPLACE (17) DRYER ON 1ST FLOOR, INSTALL NEW HOT WATER HEATER AT CELLAR AS PER PLAN AND REQUEST GAS AUTHORIZATION. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
INSTALLATION OF PLUMBING FIXTURES AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY
Proposed water, sanitary sewer, and storm in OSP, GF and 1st FL to connect the new modular residence to city lines. The modular residence is under NYS Jurisdiction (see GC approved plans).
NEW PLUMBING GAS SERVICE/PIPING/DISTRIBUTION FILED IN CONJUNCTION WITH X01146240-I1 IN ACCORDANCE WITH 2022 NYC CODES AND AUTHORITIES HAVING JURISDICTION. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
INSTALL NEW GAS COMMERCIAL KITCHEN EQUIPMENT
RENOVATION OF EXISTING CELLAR, 1ST AND 2ND FLOOR WITH PLUMBING WORK:REPLACE KITCHEN AND BATHROOM FIXTURES; NEW 2-PC RESTROOM, WASHER AND DRYER ON CELLAR; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
LEGALIZE THE AREA DRAIN FOR THE PROPOSED EXTERIOR STAIRS FILED UNDER APPLICATION NO. B01422035 - I1 TO REMEDY OATH/ECB VIOLATION #39176514J
New construction of three story sfr with attached garage 3.5 baths and 2 bedrooms
Replacing orangeburg sewer pipe in side yard and backyard.
New construction of three story sfr with attached garage 3.5 baths and 2 bedrooms
Replacement of an existing water heater
Replace gas water heater located in the garage.
Dig in grassy area after COA said it was our responsibility to repair broken pipe.
Replace the sewer yard line with Sch. 40 PVC piping.
Tunnel under the foundation to replace the cast-iron drain lines. There will be two access holes: one in front and one on the side.
Irrigation Installation
Irrigation of New Irrigation
Installation of New Irrigation
REPLACE50 GALLON ELECTRIC WATER HEATER
new install on new home build
Installation of New Irrigation
Pool 30x16ft with spa 8x8ft. Gas heater and autofill.
Installation of New Irrigation
Gas test gas was turn off and customer need gas test