Search Permits
16,709 results · type: electrical
Bldg #3 New 2-story single family residence 4 bed/2.5 bath attached garage covered porch and covered patio green building smart housing
Bldg #4 New 2-story single family residence 4 bed/2.5 bath attached garage covered porch and covered patio green building smart housing
Replacing 200A meter & rebuilding existing 200A main breaker panel bringing 200A main breaker NEMA3 panel to NEC
Install Level 2 EV Charger
Upgrade service from 150 amps to 200 amps new overhead Riser new 200 amp meter can new 200 amp main breaker kit new whole house surge protection new additional grounding new inner system ground
New construction Boat Dock/Shoreline improvements (may also include demolition of existing boat dock)
Emergency Inspection-Repair an electrical braker box inside the unit apartment
electrical_permit_(r)
electrical_permit_(r)
electrical_permit_(c)
electrical_permit_(r)
electrical_permit_(r)
electrical_permit_(r)
TEMP POWER RELATED TO COB26-00101
PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEE
Install 200 amp 1° 240/120 volt sub-panel on metal building. Approximately 160' 2" PVC conduit with 3-3/0 THHN copper conductors with #6 Ground.
PERMIT IS ONLY FOR INSTALLATION OF ONE TESLA POWERWALL 3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEES
PERMIT IS ONLY FOR INSTALLATION OF ONE TESLA POWERWALL 3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEES
Upgrade current electrical panel to 400 amps
Remove and replace 200AMP panel.
Backup battery install.
Replacing a damaged 200a main service and upgrading to a new 400a main panel.
electrical
electrical
electrical
electrical
electrical
Remove existing service and install new 400 amp rated overhead rack service with three meters with 125 amp MCBs for unit A B and C . Install whole house surge protection additional grounding Run new sub-feeds under ground to all three units add new 125 amp MCB load centers at unit B and C
Bldg. 1 - New construction of 3 story SFR w/ attached carport covered front porch and uncovered wood steps at rear and rooftop uncovered balcony. 3 bedroom 3.5 baths
ePlan: Residential Expedited Review - New construction of a 2-Story Single Family Res. [3bed 2.5bath] with Attached Carport. Bldg 2