Search Permits
11,965 results · type: mechanical
Replacement of complete existing central heat and air system with or without duct work Removed the old unit and installed 1 new HVAC system without ductwork
Replacement of complete existing central heat and air system with or without duct work Replacement of HVAC system without duct work for Unit 711
Replacement of complete existing central heat and air system with or without duct work HVAC Change out only
New single-story SFR *PRODUCTION BUILDER*
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work HVAC Change out only
Interior remodel 2nd floor areas at existing manufacturing facility- Etch Paros
Replacement of complete existing central heat and air system with or without duct work Replacement of HVAC system.
New construction of a 2-story single family residence. With attached garage covered porch and patio 4/5.5 *Please reference approved PUD C8J-2020-0148.1B. Please note that ROW permits shall be obtained through Travis County.
ePlan: Residential Expedited Review - New construction of a 1-Story Single Family Res. [2bed 3bath] with Attached Garage.
Replacement of complete existing central heat and air system with or without duct work Patricia Hospie: Replace 4-ton like-for-like electric system
Replacement of complete existing central heat and air system with or without duct work
New Construction of a new 1 story single family residence with covered porch and patio 4 bedroom 3 bathroom.
Install a 9K btu ductless mini split heat pump in a bedroom
mechanical_permit_(r)
Gas Vacancy Inspection
Gas vacancy inspection
Filing for gas test only
File for a gas line, a gas stove, and a gas tankless water heater for the property address 3243 PONCE DE LEON ST
Install natural gas water heater in laundry room
6 month gas occupancy
disconnect and reconnect gas line for home elevation with exsisting outlets. need gas meter
mechanical
mechanical
mechanical
mechanical
Installation of a temporary Material hoist per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
TEMPORARY ROOF PROTECTION AT ADJOINING PROPERTIES DURING NB CONST, FILED SEP. ROOF PROTECTION SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
INSTALLATION OF OVERHEAD PROTECTION AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER # 33 OF THE 2022 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
REPLACE ONE (1) COMPUTER ROOM AIR CONDITIONING (CRAC) UNIT ON SECOND FLOOR AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.