Search Permits
199,472 results
Reconstruction of grandfathered boat dock
Replacement of complete existing central heat and air system with or without duct work
Express- Foundation repair. 14 exterior pilings.
PROPOSED NEW ONE STORY 4969 SF CONVENIENCE STORE.
Replace sewer line via tunnel
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
We will need to remove the electrical meter. we will be replacing the electrical panel only. the meter can should remain the same.
Galloway 3312 A Right New - 1 Story SFR CONDOMINUM w/ 3 bedrooms 2 bathrooms attached 2 car garage covered entry porch and patio FFE: 685.66 Site Plan: SP-2021-0328C Site Plan Exp.: 01/09/27 Max Bld height: 21-10 Actual Bld height: 21-10 required parking: 2.
Replacement of complete existing central heat and air system with or without duct work Install replacement of 2.5 Ton AC System
install temporary overhead construction loop. 125 amp Main breaker loadcenter per Austin Energy criteria
Randall 3314 C Right New - 2 Story SFR CONDOMINUM w/ 3 bedrooms 2.5 bathrooms attached 2 car garage covered entry porch and patio FFE: 684.95 Site Plan: SP-2021-0328C Site Plan Exp.: 01/09/27 Max Bld height: 30-9 Actual Bld height: 30-9 required parking: 2.
Highland 3313 B Left New - 1 Story SFR CONDOMINUM w/ 3 bedrooms 2 bathrooms attached 2 car garage covered entry porch and patio FFE: 692.62 Site Plan: SP-2021-0328C Site Plan Exp.: 01/09/27 Max Bld height: 21-10 Actual Bld height: 21-10 required parking: 2.
Replacement of furnace only
New Autofill Pool for 1912 S 3RD ST
Replacement of complete existing central heat and air system with or without duct work QUINN
Highland 3313 B Left New - 1 Story SFR CONDOMINUM w/ 3 bedrooms 2 bathrooms attached 2 car garage covered entry porch and patio FFE: 681.57 Site Plan: SP-2021-0328C Site Plan Exp.: 01/09/27 Max Bld height: 21-10 Actual Bld height: 21-10 required parking: 2.
Replacement of an existing water heater 40gal gas tank
Install Sprinkler System
Interior Renovation for Apartment Complex-Convert Existing Tubs to Showers. Replace all Existing Counter Tops Cabinets and Fixtures and Equipment with New. Replace all Existing Gypsum Boards with New. Replace all Existing Doors with New. Replace all Ceiling and Floor Finishes with New. Units B201 B202 B203 B204 B205
Replacement of complete existing central heat and air system with or without duct work HVAC Replacement
T-pole for 2705 Bristol Dr
New construction in-ground pool and spa.
Change of Use from Religious Assembly to Admin/Bus Office with minor interior remodel. 2026-012346 DA
EV Charger
Express - Foundation Repair
ERAC Corp. Wall Sign
***Timed Virtual Inspection: 06/30/2026 @ 8 AM*** Replacement of complete existing central heat and air system with or without duct work
Unit B - New construction of 2 story duplex (attached condo) each with 2 beds and 2.5 baths attached 2 car garage