Search Permits
13,330 results · type: plumbing
New Construction or Additions
New Construction or Additions
Alterations
Alterations
EZ Bathroom & Kitchen Remodel
Alterations
Alterations
Alterations
Alterations
New Construction or Additions
Alterations
Alterations
Alterations
Alterations
Alterations
Alterations
Alterations
NEW 5 STORY HOTEL 79564 sf
New 2-story 4 bedroom 2 bathroom accessory structure consisting of two bedrooms and one bathroom on the first floor with a covered porch and two bedrooms and one bathroom on the second floor accessed via an exterior staircase.
install tankless gas water heater located in the attic
ePlan: Commercial Expedited Review - [AE GREEN BUILDING] New Construction of New Parking Garage New Exterior Amenity Space - Pool Deck.
Create entry tunnel(s) to replumb/re-route kitchen sink drain line. Tunnel length approx 15ft.
Express- Tub to shower conversion in master bath
Express: Repairs due to fire damage
Interior remodel existing admin office building common areas Suites 100 and 200e. Interior remodel existing admin office accessory food service Suite 124W.
Express: Repairs due to fire damage
Addition and remodel Convert unconditioned porch to conditioned sunroom covered deck addition deck addition interior renovation of kitchen bath and laundry
Replacement of an existing water heater Replace 40-gallon Gas Water Heater Location: garage
New inground swimming pool and spa w/ reqd enclosure device.
Pizarro S414 B Left New - 1 Story SFR w/ 4 bedrooms 3 bathrooms attached 2 car garage covered entry porch and patio required parking: 2.