Search Permits
16,983 results · type: electrical
New 1-story 3 bedroom 2.5 bathroom single family residence with covered porches.
Upgrade main service to 200 amps and install EV circuit and charger.
Not touching PEC meter. Replacing main 225amp panel with like
Install new Tesla PW2 energy storage system for existing residential only.
New Construction of SFR in ETJ
Express: Replacing the existing windows for the same size and location include new trim if needed. Repair and replace sections of rotten fascia and soffit new flooring interior paint. REVISION 1: add MEPs for tub-to-shower conversion kitchen remodel interior/exterior electrical panel upgrades A/C changeout water heater changeout
Emergency repair and replace mast meter & main disconnect due to safety hazard.
Install outlet near main panel
Update existing plugs and change lights to LED
RR-E01. Remove current cabinet. Replace with 56SF internally illuminated pylon cabinet on East elevation.
Install Level 2 EV Charger
T POLE ref. 2026-084948 BP
electrical_permit_(c)
electrical_permit_(r)
electrical_permit_(c)
electrical_permit_(c)
electrical_permit_(r)
electrical_permit_(r)
PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEE
New 200A electric service panel upgrade. New location per engineered plans. All work must comply with City of Mesa adopted 2024 International Code Council (ICC) “family” of codes, the 2023 National Electric Code produced by the National Fire Protection Association and City of Mesa Amendments.
PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEE
Residential Electrical Repair Like for Like-no plans required. Installation shall comply with City of Mesa codes and servicing electric utility requirements. DO NOT DISCONNECT UTILITY WIRES OR METERS. THE ACT OF SELF DISCONNECTING UTILITY WIRES OR METERS IS PROHIBITED AND MAY CAUSE DAMAGE OR INJURIES. Failure to schedule disconnect may result in additional utility trip charge fees and charges for any damage to utility equipment. Please contact your applicable utility(either SRP at 602 - 236-
electrical
electrical
electrical
Service Replacement
Conversion of existing garage into a habitable bedroom. The scope of work includes framing insulation drywall electrical outlets/lights HVAC extension from main system and window installation to meet egress. No plumbing work is included. Revision 1-Electrical work (Outlets Lights and Switches) Also changing the orientation of the door for the water heater to be accessed from within the laundry room rather than the main hallway.
Dominguez/Loera - 39-64677 - Install new 5.7 kW rooftop solar system to existing residential only using backfed breaker only.
Home builders loop Blue Bonnet Ref: 2026-076919 EP
Temp power Ref: 2026-014112 BP