Search Permits
18,575 results · type: plumbing
Installation of the onsite underground water line piping and wastewater piping. approx 500 lf of 6 WW and 120 lf of 2.5 Water
Installation of W and WW Plumbing Service line up to 5 ft from bldg or structure only. 280 LF of 6 SDR 26 pipe and 4 6 cleanouts
Replacement of an existing water heater Replacement of a 40 gallon natural gas standard water heater.
Replacement of an existing water heater 50 Gallon Natural Gas Water Heater Replacement
Will be replacing sewer yard line and water yard line Approximate 45 ft each
Tankless water heater replacement
Installing a new irrigation system
New Construction of SFR in ETJ
irrigation install
New single-story SFR *PRODUCTION BUILDER*
irrigation install
Install Irrigation System
irrigation install
Interior Renovation for Apartment Complex-Convert Existing Tubs to Showers. Replace all Existing Counter Tops Cabinets and Fixtures and Equipment with New. Replace all Existing Gypsum Boards with New. Replace all Existing Doors with New. Replace all Ceiling and Floor Finishes with New. (5) Applications submitted
Replacement of an existing water heater Change out NG Water Heater Like for Like
New Plumbing for SFR in ETJ
Total demo of Duplex 1403 sq ft circa 1964 ***The building shall not be demolished until after the contractor has fulfilled the neighbor notification requirements outlined in Steps 5 & 6 of the Demolition webpage.***
ePlan: Commercial Expedited Review - First Time Finish-Out for Admin Office Floor 15 Suite 1511 (4302 SF)
Total demo of sfr 1054 sqft circa 1936
Replacement of an existing water heater 40 gallon natural Gas Water heater Instal
Total demo of SFR 1048 sq ft circa 1950 ***The building shall not be demolished until after the contractor has fulfilled the neighbor notification requirements outlined in Steps 5 & 6 of the Demolition webpage.***
New Construction of SFR in ETJ
Install Irrigation System
Plumbing for New Construction of SFR in the ETJ 2039 sq ft
New Construction of SFR in ETJ
broken sanirtary line under building at 16 and 40 in from clean out .stopping flow of waste tunnel and repair BLDG 4
ETJ new service for SFR
Replacement of an existing water heater replacing like/like G water heater
install a new 1-inch PEX water service from the existing water meter to the residence. The new service line will be installed from the water meter to the foundation of the home in accordance with applicable plumbing codes and industry standards. Entry into the residence will be accomplished by core drilling through the existing brick veneer and wall assembly at an appropriate location to minimize structural impact while maintaining a watertight penetration. The wall penetration will be properly
New construction single-family residential 1-story 5 bedroom 4.5 bath with attached 3-car garage covered front porch and covered rear patio.