Search Permits
12,059 results · type: electrical
Upgrade to 200 Amp Service
Smart Housing: New construction of 2 story SFR condo with attached garage and covered porch 2/2.5
Bank of America TX9-325 - Install front-lit channel letters on raceway on SW elevation (front)
Change of Use personal services to Medical - 2880 SF new build-out of existing shell space construction to include: interior walls floors finishes interior doors millwork and light fixtures.
New wood frame slab on grade two-story structure. The existing historic facade and parts of the side walls are to remain. An uncovered wood deck and attached open air car port included in the renovation. Total SF of the new design is 4153 SF.
HWS 45746 Sign A - Install front-lit channel letters on East elevation HOMEWOOD SUITES by Hilton
ePlan: Residential Expedited Review - New TWO UNIT RES. Bldg 2 New construction of a 2-Story SF Res [4bed 3bath] with attached Garage
ePlan: Residential Expedited Review - New Autofill/Heated pool
New 1-story 2 bedroom 1 bathroom dwelling unit.
stand alone tpole Ref: 2026-012390-BP
Main panel replacement
ePlan: Residential Expedited Review - New construction of a 2-Story Duplex [1bed 1bath] with attached Garage. Unit B
28729 HACA - E.2 Illuminated Badge Logo
Installing a New Meter in ETJ
Installing 73.70 kW DC (60.00 kW AC) solar system with 134 ALEXUS ALEX-550-W-144-S panels and 1 SCA60KTL-DO/US-480 inverter.
200 AMP METER FOR VERIZON IN EXISTING SOCKET
VOID - Permit not need for this type of work in the ETJ. Only the building permit for the boat dock is necessary for inspections at this site on Lake Austin. Electrical installation for new boat dock including feeder/service wiring branch circuits disconnect grounding and bonding lighting receptacles and equipment connections associated with the new dock construction under related SP-2025-0053D permit
we are upgrading a 100 amp panel to a 200amp panel and meter and 200 amp sup panel
REPLACE THE SERVICE FOR OFFICE COMPLEX INCLUDES 4 OCCUPIED OFFICES- THE SERVICE CAUGHT FIRE AND NEEDS NEW GUTTER TAP BOX DISCONNECTS AND METERS; NO ESPA NEEDED- PEC ELECTRIC SVC PROVIDER
Remodel of Master Bedroom & Addition of Sunroom where current second story balcony is.
Interior Remodel and Garage Conversion Kitchen remodel expanding kitchen to garage (see attachment)
Emergency repair of riser only - damaged from storm 5/21/26 SM - REVISED ** Emergency inspection new riser meter main disconnect panel.
New Service for Cell Tower - Verizon
ePlan: Residential Expedited Review - New construction of a 2-Story Duplex [3bed 3.5bath] with Autofill Pool. Unit A
ePlan: Commercial Expedited Review - Interior Remodel -Sec 3 Floors 3-4 (38300 SF).
electrical_permit_(c)
electrical_permit_(r)
Electrical
Electrical
Electrical