Search Permits
11,850 results · type: mechanical
EQUIPMENT USE: INSTALLATION OF A PERSONNEL CONSTRUCTION HOIST COMPLEX AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. HOIST INSTALLED IN COMPLIANCE WITH CHAPTER 33 OF 2022 NYC BUILDING CODE.
Installation of a temporary shoring per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
INSTALLATION OF TEMPORARY NEEDLE BEAM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
INSTALLATION OF ENGINEERED ENCLOSURE SYSTEM AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER # 33 OF THE 2022 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Use of telehandler construction equipment as per plans filed herewith
Use of Knuckleboom for building construction. This application is filed in conjunction with NB M01231645-I1
Installation of temporary engineered overhead protection within a private alley between existing buildings to provide protection from overhead construction activities. no change in use, occupancy or egress. all work to comply with chapter 33 of nycbc
Installation of a temporary roof protection , overhead protection and shoring per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application
FILING FOR MECHANICAL WORK ASSOCIATED WITH INTERIOR RENO OF 6TH FLOOR DYNASTY OFFICE AS PER PLANS SUBMITTED HEREWITH.
APPLICATION FILED FOR MECHANICAL ADDITIONS/MODIFICATIONS ON THE 1ST FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY
STORAGE OF MATERIAL / EQUIPMENT ON TOP OF HEAVY DUTY SIDEWALK SHED. STORAGE SHALL NOT EXCEED 50 PSF. SHED FILED UNDER SEPARATE APPLICATION. STORAGE SHALL COMPLY WITH CH#33 OF THE NYC BLDG CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION
APPLICATION FILED TO CONSTRUCTION NEW PARTITIONS AND DOORS PER PLANS FOR A SUB-DIVIDE TWOSTORE. NO CHANGE IN USE, OCCUPANCY AND MEANS OF EGRESS IS INVOLVED UNDER THIS APPLICATION.
minor mechanical work as per plans
INSTALLATION AND USE OF TEMPORARY OVERHEAD, ROOF AND MECHANICAL PROTECTION AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OCCUPANCY UNDER THIS APPLICATION.
REMOVAL OF EXISTING MECHANICAL SYSTEMS IN THE NURSERY SCHOOL LIBRARY.REMOVAL OF EXISTING REGISTERS. INSTALLATION OF NEW AIR-COOLED SPLIT HEATPUMP UNITS FOR THE LIBRARY, TEACHERS LOUNGE, STORAGE AND PARENT'SASSOCIATION ROOM.
MECHANICAL MODIFICATIONS TAKING PLACE ON THE 23RD FLOOR AS PER DRAWINGS FILED HEREEWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Mechanical work as shown on plans filed herewith.
Modifications to the existing HVAC system on the 9th floor as per plans. No change to use, egress or occupancy.
Hereby filing to remove mechanical units and modify ductwork and piping in existing retail space as shown on plans filed herewith. No change to use, occupancy or egress.
Modification to HVAC system
Mechanical work filed in conjunction with the renovation of an existing dwelling unit as per plans. No change of use, occupancy or egress.
Replace one (1) existing mini-split unit and install one (1) new mini-split unit serving the server room and ATM room. Work includes new refrigerant and condensate piping. No change in use, occupancy or egress.
INSTALL NEW CHIMNEY LINER AS PER PLANS. NO CHANGE TO USE, OCCUPANCY OR EGRESS
MECHANICAL MEANS SUBMITTED FOR USE OF MECHANICAL EQUIPMENT ON GRADE AT THE TIME OF DEMOLITION
DIRECT REPLACEMENT OF ROOF TOP UNIT
MECHANICAL FILLING IN CONJUNCTION WITH ALT CO FILLING TO ENLARGE THE FIRST FLOOR AND ADD A NEW THIRD FLOOR TO OBTAIN A NEW CERTIFICATE OF OCCUPANCY
Interior renovation to CVS to enlarge interior pharmacy department. non-structural walls, replace millwork, shelves, finishes, light. install new (1) register and (1) return grilles, connect to existing ductwork.
INSTALL CHIMNEY LINER AS PER PLANS. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
MECHANICAL WORK TAKING PLACE ON THE 9TH, 27TH, 32ND, AND 41ST FLOORS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Filing subsequent mechanical application for installation of HVAC units for 5th floor medical office, as per plans submitted