Search Permits
198,831 results
temporary tpole for new construction in Stoney Chase.
INSTALL NEW EXHAUST/VENT/DUCT SYSTEM FOR LAB 186/R&D LAB 184.
Plumbing for New SFR in the ETJ (sq ft 2698)
Replacement of complete existing central heat and air system with or without duct work LIKE FOR LIKE: 3 Ton 2 Stage Horizontal Gas
Excavate 11 tunnel to repair the main drain line under the house.
Phase 1 Conversion of an existing pre-engineered metal building into a temporary Nissan showroom with a display area customer lounges restrooms and sales offices and Installation of Private Fire Line. - Phase 1 to Include interior build out including electrical paint finishes floor finishes lighting interior partitions and mill-work.
New single family residence - 1 story 4 bed/2 bath 1853 sqft living with attached garage
Install illuminated wall sign reading HOME 2 SUITES BY HILTON on West Elevation
Galloway 3312 C Right New - 1 Story SFR CONDOMINUM w/ 3 bedrooms 2 bathrooms attached 2 car garage covered entry porch and patio FFE: 680.51 Site Plan: SP-2021-0328C Site Plan Exp.: 01/09/27 Max Bld height: 24-8 Actual Bld height: 24-8 required parking: 2.
Interior remodel of SFR Replacing flooring interior doors cabinets trim and plumbing fixtures. Removing wall in kitchen and creating a new closet in the primary bedroom. Relocating existing shower in primary bath and adding lighting. Replacing various windows and front door.
Galloway 3312 C Right New - 1 Story SFR CONDOMINUM w/ 3 bedrooms 2 bathrooms attached 2 car garage covered entry porch and patio FFE: 680.51 Site Plan: SP-2021-0328C Site Plan Exp.: 01/09/27 Max Bld height: 24-8 Actual Bld height: 24-8 required parking: 2.
Construct new driveway approach of 12 FT and Curb/Gutter of 10FT. No sidewalk inspection per plan review.
Remove Concrete Pillars by Replacing them with Metal Beams and Metal Columns to an Exiting Old Car Wash 2024 159186 DA -Concurrent Review
Second generation tenant improvement converting an existing pizza shop into a ramen shop. No change in zoning use. The scope of work includes a new interior layout and associated mechanical electrical and plumbing improvements. The existing grease trap shall remain.
Boone S413 B Right New - 1 Story SFR w/ 4 bedrooms 2 bathrooms attached 2 car garage covered entry porch and patio required parking: 2.
replace meter can only for Bldg A Unit 4
ELECTRIC AVE TATTOO
ePlan: Commercial Expedited Review - Interior Remodel to Existing Office - Phase 5a - 4th Floor Office Tenant Improvements. finishes plumbing light fixtures refresh finish & millwork upgrades to an existing kitchen new training room doors and updated patio terrace furniture with new trellis (131364 SF Total)
New construction of a 2-story single family dwelling in a condo regime. 4 Bedrooms 3.5 bathrooms with attached 2 car garage
New in-ground pool with required enclosure (heater or autofill)
Homebuilders loop for New SFR ref 2026-067515 BP. Austin Full purpose
INTERIOR PARTITION REMODEL ONLY - REARRANGE THE EXISTING CLIMATE CONTROLLED OFFICE/STORAGE AREA INTO SMALLER SIZED SELF STORAGE UNITS. (BUILDING B)
PB: New construction of 2 story SFR condo - 2.5 baths 3 beds attached garage covered patio Revision 1: Add STUDY OPTION to this plan.
Replacement of complete existing central heat and air system with or without duct work 4-TON CONDENSER CHANGE-OUT & 88K BTU FURNACE CHANGE-OUT
Modification of an existing conference room for a new conference room and equipment replacement. Existing office.
***Timed In-Person Inspection: 06/24/2026 @ 9 AM*** Replacement of an existing water heater replacing like/like E water heater in garage.
Replacement of an existing water heater Replacing like/like G water heater in garage.
New Inground pool/spa & Concrete decking - approx 200 sqft of existing impervious coverage to be removed
AT&T Proposes- Tower SOW: Install (8) CCI Antennas (8) air antennas (12) radios (3) Surge protectors (2) fiber trunks (7) DC trunks Ground SOW: Install (1) 7-3 x 15-0 raised equipment steel platform (1) 2-0 wide ice bridge (1) equip. cabinet (1) intersect PPC (1) surge suppression (1) 20kW 48V DC Diesel Generator (8) 190AH Batteries. See plans for full scope
Replacing aluminum wire in bedrooms