Search Permits
16,916 results · type: electrical
Providing underground electrical service to building 600 sq ft ETJ
Electrical meter installation for New Construction of SFR in the ETJ 2595 sq ft
Homebuilder Loop Austin 2 Mile ETJ Austin Energy
AMG Womens Hospital W35
New construction of a 2 story SFR with 4 bedrooms 5.5 baths an attached garage covered porch and covered patio.
BASE: Submitting repair application as per Hyatts on-site request. Part of Base battery program with Austin Energy.
Replace main breaker in panel feeding security gates cameras and EV chargers.
Upgrade to a 200A Service Only
Homebuilder Loop Austin 2 Mile ETJ Austin Energy
ETJ new service for SFR
Replace Main panel by the meter
Provide electrical power for future E-Bike Share.
Pool - New In-ground 170 SF Concrete Pool and Spa along with associated equipment and pad.
THE SCOPE OF WORK IS TO REMODEL THE EXISTING RESTAURANT SPACE FOR A NEW RESTAURANT SPACE.
Homebuilder Loop Austin 2 Mile ETJ Austin Energy
electrical_permit_(c)
electrical_permit_(r)
electrical_permit_(r)
electrical_permit_(r)
electrical_permit_(r)
electrical_permit_(r)
PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEE
Extend existing 120V, 15A branch circuit from existing master bedroom receptacle to install one new weather-resistant GFCI receptacle in rear yard. Wiring routed through junction box and PVC conduit. Electrical only. Minimum required building inspections: Electric rough in and electric final.
PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEE
PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEE
Installation of 200 Amp electric service - no plans required. Installation shall comply with City of Mesa codes and servicing electric utility requirements. DO NOT DISCONNECT UTILITY WIRES OR METERS. Schedule disconnect/reconnect with serving utility and obtain utility service requirements specific to your permit.
PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEE
PERMIT IS ONLY FOR AN UPGRADE TO A NEW 200AMP PANEL AND THE INSTALLATION OF ONE TESLA POWERWALL 3. B.E.S.S. SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 70 PER R327.4. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YO
Replacement of 200 Amp (or less) electric panel - no plans required. Installation shall comply with City of Mesa codes and servicing electric utility requirements. DO NOT DISCONNECT UTILITY WIRES OR METERS. THE ACT OF SELF DISCONNECTING UTILITY WIRES OR METERS IS PROHIBITED AND MAY CAUSE DAMAGE OR INJURIES. Failure to schedule disconnect may result in additional utility trip charge fees and charges for any damage to utility equipment. Please contact your applicable utility (either SRP at 602
electrical