Search Permits
11,850 results · type: mechanical
Replacing HVAC unit on roof with new as per plans filed herewith.
INSTALLMENT OF TWO YORK CHILLERS IN SUB-CELLAR 1, SUB-CELLAR 2 AND TWO SPLIT DAIKIN UNITS ON MAIN ROOF, NO CHANGE IN EGRESS OR OCCUPANCY.
FILING FOR MECHANICAL WORK ASSOCIATED WITH INTERIOR RENO OF 19TH FLOOR AMAZON EDITORS LAB AS PER PLANS SUBMITTED HEREWITH.
Modifications to the existing HVAC system on the 29th and 30th floors (Day 2 TradeWeb) as per plans. No change to use, egress or occupancy.
INSTALL NEW SPLIT A.C. SYSTEM AT FIRST FLOOR OF EXISTING 18-STORY BUILDING WITH MECHANICAL WORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR CERTIFICATE OF OCCUPANCY.
FILE MECHANICAL WORK TO INSTALL (3)THREE OUTDOOR CONDENSER UNITS AT 2ND FL. ROOF TERRACE FOR AUDITORIUM OF PUBLIC SCHOOL X166. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Mechanical work for 1st floor tenant fit-out, including HVAC ductwork modifications, diffuser/thermostat relocation, air cleaner installation, toilet exhaust connection, air balancing, duct insulation, dampers, controls, and related work.
EXISTING COMMERCIAL SPACE, MECHANICAL SYSTEM IN CONJUNCTION WITH JOB #M01414626, OBTAIN MECHANICAL PERMIT FOR THE INSTALL NAIL SALON VENTILATION SYSTEM WORKS.
Modifications to existing HVAC system & related piping for new tenant office space. No change in use, egress or occupancy.
Scope limited to removal of fan-powered VAV and associated ductwork.
JOB FILED TO ANSWER AUDIT OBJECTIONS FOR JOB#123737867. ALL WORK WAS DONE UNDER JOB#123737867. NO CHANGE OF USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
MECHANICAL SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION B01272085-I1
RMVE 1 EXST AIR COOLD 20 T GAS FIRED AC , 1 EXST AIR COOLD 2T & 1 EXST AIR COOLD 1.5T SPLT SYSTM @ ROOF. RPLCE IN KIND W EQ SPECS. RMVE 2 EXST INTRIOR AIR HNDLRS & RPLCE W NEW UNITS OF EQ SPECS. PER SCTN AC 28-104.7, 2022 NYC BLDG MECHCODE & 2025 NYCECC.
PROPOSED CHANGE TO METES AND BOUNDS, FULL INTERIOR RENOVATION, AND CONVERSION TO 2-FAMILY.
Replace 2 old HVAC units with new ones on roof.
Replace central HVAC system complete with air handling units. Units should be fed from the base building chill/hot water system. No refrigerant system is proposed in this project. Install radiant floor. No change in use ,egress or occupancy.
MECHANICAL WORK TAKING PLACE ON THE 40TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Mechanical work as shown on plans filed herewith. No change in use, egress or occupancy.
Mechanical work as shown on plans filed herewith. No change to use egress or occupancy.
FILING HEREWITH PLANS AND APPLICATIONS FOR PROPOSED ICE CREAM PARLOR IN EXISTING COMMERCIAL SPACE. 2 NEW CONDENSERS WITH SPLIT UNITS TO BE INSTALLED ON THE ROOF. PL FILED UNDER X01405942-S1.
MECHANICAL SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION X01339801-I1
Addition and/or Alterations
Addition and/or Alterations
New Construction
New Construction
Addition and/or Alterations
New Construction
Addition and/or Alterations
New Construction
Addition and/or Alterations