Search Permits
198,754 results
mechanical
zoning
zoning
electrical
electrical
Upgrade/ Change electrical service Upgrade to 200 Amp panel and meter base
Excavate 7 tunnel to repair main drain line under the house
*Green Building* New 2-story 3 bedroom 2.5 bathroom single family residence with attached garage covered front porch and rear covered patio.
Shade Structure Canopy a with lighting; SP reference SP-2025-0254c (Building A)
Install car charger
Shade Structure Canopy D with lighting; Site Plan Reference SP-2025-0254C (Building D)
New pool and spa
New construction of single family dwelling with 4 bedrooms and 3.5 baths 2 car garage rear patio and front porch PUD
ePlan: Residential Expedited Review - Addition and Remodel to Existing 1-Story Single Family Res. [4bed 2bath] Work to include: First floor Interior remodel First Floor Addition new bath [4bed 3bath].
New Construction of a single family 1 story 4 bed 2 bath with attached garage and covered front porch/rear covered patio
New pool with required enclosure and concrete deck (heater or autofill)
Shade Structure Canopy E with lighting; Site Plan reference SP-2025-0254C (Building E)
AISD Bond 2022 modernization of Fine Arts and Athletics program spaces. Renovation of Music studios Dance Arts 2D and 3D Art. Renovation of Athletics Trainers Room.
Construct new driveway approach of 20 FT and curb & gutter of 12 FT.
ETJ New Construction of a SFR 2429 sq ft Meter Installation.
Installing generator and ATS
SP Condo: New SFR - 3 bed 2.5 bath 2 car attached garage rear covered porch
PB: New construction of 1 story SFR with 4 bedrooms and 3.5 baths 3 car garage rear patio and front porch
Connect New Mobile Home w/ Decks (4x4 front & back)
Replacement of mini-split system New mini split change out
Replacement of an existing water heater 40 gallon propane gas tank water heater change out 17003 Flintrock Road Austin TX 78738
Minor interior remodel for existing Medical Office.
QT - Install shade structure at existing school - OVA
Interior Remodel - renovating the interior of the home to be an open format floor plan with the removal of the central wall. New drywall to be installed and patched in areas exceeding 120 linear feet plumbing fixtures moved from south wall to north wall in primary bathroom window replacement like for like in the entire home and a french door to window change in the primary bedroom (egress area but with no change to width). Gas line to shift from the west to south wall of the kitchen. Attached ca
Replacement of complete existing central heat and air system with or without duct work HVAC Replacement at 608 W Mary St