Search Permits
11,850 results · type: mechanical
installation of one 48000 minisplit unit
22 kW Generator Installation ** Entergy Elec / Delta Gas (New Meter)
Pump up gas 3 to 5 psi and make sure system holds 100 percent
-pump up gas line 3 to 5 psi and check for gas leaks Repair one gas leak, install a dryer vent and flex line
5 ton electric AC system replacement
mechanical
mechanical
mechanical
mechanical
INSTALLATION OF TEMPORARY ROOF PROTECTION AS PER DRAWINGS, ROOF PROTECTION SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
KNUCKLEBOOM PLACEMENT. THIS APPLICATION INVOLVES NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Use of temporary knuckle boom construction equipment as per plans filed herewith. This application is filed in conjunction with NB X00968343-I1.
Install new AC unit for suite 601 on 6th fl. No change in use, egress or occupancy
INSTALLATION OF TEMPORARY ROOF PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY SHALL COMPLY WITH CHAPTER#33 OF 2022 THE NY BUILDING CODE.
Use of mini crane construction equipment as per plans filed herewith
INSTALLATION AND USE OF TEMPORARY INTERIOR CLIMBING PLATFORMS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
INSTALLATION OF NEW HVAC UNITS WITH DUCT WORK AND PIPING (MS) WORK FOR EATING OR DRINKING ESTABLISHMENT AS PER PLAN.
mechanical means will assist with demolition from exterior and on grade
INSTALLATION OF ENGINEERED ENCLOSURE SYSTEM AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER # 33 OF THE 2022 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
INSTALLATION OF TEMPORARY PLYWOOD ENCLOSURE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY SHALL COMPLY WITH CHAPTER#33 OF 2022 THE NY BUILDING CODE.
INSTALLATION OF TEMPORARY ROOF PROTECTION AS PER DRAWINGS, ROOF PROTECTION SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Installation of a temporary Material storage per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
HVAC Units replacement. No change in use egress and occupancy.
Installation of (2) Wall Mounted Ductless Air Handling Units, Associated Piping, Controls, (2) Condensate Pumps & Piping Within Elevator Machine Rooms and (2) Outdoor Condensers, Associated Piping & Support Curbs on Roof
Filing to install the deli kitchen hood and ductwork as per plans.
INSTALLATION OF TEMPORARY PERSONNEL HOIST AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
MECHANICAL SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION X01225221-I1
Mechanical work for interior demolition on 28th marketing floor (27th construction floor). Work to include demolition of multi-zone VAV system and supplemental condenser water system.
Propose installation of ductwork, air outlets, a toilet exhaust fan and associated controls serving restrooms on the 6th floor. No change in use, egress or occupancy.
Mechanical work as shown on plans filed herewith.