Search Permits
16,916 results · type: electrical
Homebuilders loop for New SFR ref 2026-080774 BP. Austin Full purpose
Expedited Review: New Construction of a 2-Story Detached Garage with accessory structure above [1bed 1bath]
Interior tenant improvements of ike kind to an existing office/ warehouse lease space within an existing single story building.
New 2-story Condo SF Residence 4 bedrooms 3 bathrooms
Expedited Review: New Construction of a 2-Story Single Family Res [4bed 3.5bath] with attached 2-Car Garage and Detached Garage with accessory structure above [1bed 1bath] and Pool.
***EMERGENCY***Install/Replace 125 amp main breaker no meter work
Install a new 50A circuit in the 150A main service panel and route wiring directly behind the main panel to the left interior garage wall Install the NEMA 14-50 in an Indoor-Rated NEMA Receptacle Cover and Box.
Interior finish out (Building 21)
Replace existing 100A meter with 200A meter on member owned pole
upgrade Electircal underground Serivce to 200 amp
Add car charger
ePlan: Commercial Expedited Review - New Construction of Restaurant (5166 SF)
New garage with apartment and a separate permit for pre-manufactured pool inside the building
Install Level 2 EV Charger
Installation GENERAC 22 KW AIR-COOLED STANDBY GENERATOR (MODEL #G007260-0)
Temporary construction power for jobsite ref: 2025 047435 BP
Total removal of all hazardous electrical service and riser. Installation of new Austin energy approved meter can new 200-amp main breaker eaton CH load center install installation of new CH lifetime warranty circuit breakers installation of 28-foot ground rods insulation of new water bond installation of gas bond insulation of new whole home surge protection.
Add 60 Amp car charger in garage
electrical_permit_(r)
electrical_permit_(r)
electrical_permit_(r)
electrical_permit_(c)
electrical_permit_(r)
electrical_permit_(c)
PERMIT IS ONLY FOR UPGRADE TO A 225A SERVICE AND INSTALLATION OF ONE TESLA POWERWALL3. B.E.S.S. SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 70 AND ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FA
PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEE
PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. B.E.S.S. SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 70 PER R327.4. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO S
INSTALLATION OF A 60 AMP DEDICATED CIRCUIT BREAKER FOR A TESLA WALL CONNECTOR VEHICLE CHARGER IN THE GARAGE. NEW 50AMP SIMPLE SWITCH INSTALL ON EXISITING OVEN CIRCUIT FOR A SECOND TESLA WALL CONNECTOR VEHICLE CHARGER IN THE GARAGE. EXISTING 200 AMP SERVICE METER. ELECTRICAL SHALL BE INSTALLED PER MANUFACTURES SPECIFICATIONS AND COMPLY WITH 2024 IBC, 2023 NEC AND SRP STANDARDS.
PERMIT IS ONLY FOR INSTALLATION OF ONE TESLA POWERWALL 3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEES
INSTALLATION OF A NEW 240 VOLT 50 AMP DEDICATED CIRCUIT BREAKER FOR ARTEMIS LEVEL2 EV CHARGER IN THE GARAGE. EXISTING 200 AMP SERVICE METER. ARTEMIS LEVEL2 CHARGER SHALL BE INSTALLED PER MANUFACTURES SPECIFICATIONS AND THE ELECTRICAL SHALL COMPLY WITH 2024 IBC, 2023 NEC AND SRP STANDARDS.