Search Permits
198,754 results
replace 2 gas regulators and make repairs to the gas line less than 3
Excavate 20 tunnel to repair the main drain line under the house
Express: Update finishes and cabinetry in existing bar and bathroom. No structural work to be performed and no changes to the floor plan.
Interior Non Structural Demo - Phase 2 - Admin Areas
Amnesty CO for non complying sf res circa 1946
Interior remodel to existing office space with new demising partition to reconfigure suites. Suite 230 is not in scope and will be permitted in a separate permit request. All work in this permit will be in suite 210 only. Suite 230 is not in scope an will be permitted in a separate permit request. All work in this permit will be in the common corridor only. No access control mechanical or plumbing scope. (App 2)
Install Sprinkler System
ePlan: Residential Expedited Review - SITE PLAN APPROVED: PHASE A - Greystar Plan A577 New 2 story SFR with 4 Bedrooms 3.5 Bath and an attached 2 car garage. FOR RECORD SET SEE: 8002 PONCHO PASS 2025-070719 PR (INCLUDES 23 ADDRESSES.)
Install Sprinkler System
Retroactive: A 16x7 non load bearing wall was framed behind interior of the existing garage door. Garage door was not removed in the process. the new wall was drywalled and painting to finish. A Daikin 18000 btu mini split was installed
ePlan: Residential Expedited Review - SITE PLAN APPROVED: PHASE A - Greystar Plan A577 New 2 story SFR with 4 Bedrooms 3.5 Bath and an attached 2 car garage. FOR RECORD SET SEE: 8002 PONCHO PASS 2025-070719 PR (INCLUDES 23 ADDRESSES.)
TEMP POWER ETJ
Replacement of an existing water heater Replace 49-gallon Electric Water Heater Water Heater located in a closet under the AC System small space
New construction of single family dwelling with 4 bedrooms and 3.5 baths 2 car garage rear patio and front porch PUD
New construction single-family residential 1-story 4 bedroom 3 bath with attached 3-car garage covered front porch and covered rear patio.
Replacement of complete existing central heat and air system with or without duct work HVAC Changeout/alteration: replace and install 2 ton air conditioner and gas furnace; like-for-like; no structural change.
Building 2 2 Story SFR with 3 bedrooms and 2.5 baths
Foundation Repair
Install Sprinkler System ETJ Ref: 2026-032664 WW
Building 1A Home: New construction of two-unit residential homes. 2 Bedroom 2.5 Baths with CP
New construction of 2 story SFR 4 beds 3 baths attached garage covered porch and patio PUD
*Green Building* New 1-story 4 bedroom 3.5 bathroom single family residence with attached garage covered front porch and rear covered patio.
Total demo of SFR 1109 sq ft circa 1942 ***The building shall not be demolished until after the contractor has fulfilled the neighbor notification requirements outlined in Steps 5 & 6 of the Demolition webpage.***
Model Home. New construction of SFR Condo with 2 beds 2.5 baths 2 car attached garage and covered front porch. The Garage will be used as a construction office.
RE-ROOF - re roof existing office building - OVA
Construct new driveway approach of 12 FT. No sidewalk inspection per plan review. ***No final inspection to take place until the type III paperwork is been completed
ePlan: Commercial Expedited Review - New Construction of 5 Service Center Bldgs. New Building - Make Ready Service Center - Business & Customer Service Space and Service Center for Heavy Duty Vehicles.
ePlan: Residential Expedited Review - SITE PLAN APPROVED: PHASE A - Greystar Plan A577 New 2 story SFR with 4 Bedrooms 3.5 Bath and an attached 2 car garage. FOR RECORD SET SEE: 8002 PONCHO PASS 2025-070719 PR (INCLUDES 23 ADDRESSES.)
Replacement of an existing water heater Replace 40-gallon Gas Water Heater Located: in outside back closet
Install Rivian Wall Charger: Use pre-wired 50-amp 240V circuit from the 200A main panel. Hardwire the Rivian Wall charger at the North Interior garage wall. Derate charger to 40-amp continuous draw.