Search Permits
18,575 results · type: plumbing
The proposed project of site improvement to an existing multifamily (senior living) community. Work includes selective demolition and replacement of existing sidewalks to provide ADA and TAS compliant accessibility routs as well as repaving of existing parking areas striping and details as needed to meet current accessibility standards. An existing storage shed will be removed. Widening existing front porch on HC units only community building. All interior work is contained entirely withing the
*Green Building* New 1-story 3 bedroom 3 bathroom single family residence with attached garages covered front porch and rear covered patio.
Plumbing Permits
Plumbing Permits
Plumbing Permits
Plumbing Permits
Plumbing Permits
Plumbing Permits
Plumbing Permits
Installation of 92-ft of 2-in PE gas line buried 18-in with 18-gauge tracer wire from gas meter to 400K BTU pool heater, 5-ft of 1-in pe gas line to 150K BTU BBQ. All gas lines are to be installed per 2024 IFGC & SW gas requirements. SW gas to determine if the meter needs to be upgraded.
Install new gas line & loop
plumbing
plumbing
plumbing
plumbing
plumbing
plumbing
plumbing
GAS CONNECTION TO REPLACEMENT BURNERS.
Plumbing demolition work including bathrooms, pantries, first floor kitchens. Replace with bathrooms and pantries on certain floors. No change of use, no change of egress, no change of occupancy proposed under this application.
PLUMBING APPLICATION FILED IN CONJUNCTION WITH NB APPLICATION FOR NEW BUILDING.
Subsequent Plumbing application in conjunction with NB application.
CONNECT TO EXISTING GAS PIPING FOR ONE (1) REPLACEMENT ROOFTOP PACKAGED HVAC UNIT AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Plumbing work as shown on plans filed herewith.
Plumbing Fixture changes as indicated on plans.
INSTALL NEW PLUMBING FIXTURES AND GAS EQUIPMENT AT CELLAR. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
REVISION TO PR 2026-002750 - TO INCLUDE ELECTRICAL MECHANICAL AND FIRE SUPPRESSION. NO ARCHITECTURAL WORK PERFORMED.
Not Pre-Plumbed Water Softener Install. No Electric Work Needed
Drain replacement: Tunnel access to replace the remaining cast iron drain pipe for the kitchen sink main 4 shared drain for the back to back bathrooms. New toilet sweep . Connection to shower and tub drains. Replace beyond the existing cast iron to pvc connection under slab and correct the pitch removing flat/ back pitched pvc. Support the new pvc remain pipes to underside of slab.
Gas test to run a T add valve to the existing supply for a stove connection