Search Permits
11,856 results · type: electrical
PERMIT IS ONLY FOR THE INSTALLATION OF TWO SIGEN BATTERIES. ALL WORK TO BE PERFORMED PER 2018 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEES AND CHA
PERMIT IS ONLY FOR UPGRADE TO A 225A SERVICE PANEL AND INSTALLATION OF TWO TESLA POWERWALL3 BATTERIES. B.E.S.S. SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 70 PER R327.4. ALL WORK TO BE PERFORMED PER 2018 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC T
New 40 AMP Simple Switch (UL E510161 rated) install on existing oven circuit. EV charger and oven on same breaker. Reviewed as noted. Electrical shall be installed per manufactures specifications and comply with 2024 IBC, 2023 NEC and SRP standards. Results in CoC.
PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEE
PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2018 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEE
Electrical service rough in and COC Form
Vacancy 2019 Marais St Apt 2B
Install (2) 3Phase Electric Vehicle Chargers with one new meter and 400A feeder system at a gasoline station on EAGLE STREET.
Vacancy inspection
Remove and replace meter socket, riser, replace conductors
Vacancy
Vacancy inspection and regroup electrical service.
Replace feeder going to the electrical panel and remove an electrical panel.
to run 60 amp power for elevator to be added.
To make repairs on wire that are hanging from ceiling ant install j box’s. Replace gfci. Vacancy inspection
Replace panel and ground system
Replace main service with new ground system and surge protection add 2 circuits for HVAC systems
Vacancy permit 4950 Dauphine St Apt 1309
Vacancy Permit 4950 Dauphine St Apt 1302
Vacancy Permit 4950 Dauphine St Apt 1116
Apartment went without power for longer than six months.
electrical
electrical
electrical
electrical
electrical
electrical
electrical
Addition and/or Alteration
Addition and/or Alteration