Search Permits
7,268 results · type: mechanical
Replacement of complete existing central heat and air system with or without duct work Install replacement of 3 Ton AC System
Bldg. 1: New 3 story SFR w/ 4 bedrooms 3.5 bathrooms attached carport and porch
Replacement of complete existing central heat and air system with or without duct work Removed the old unit and installed 1 new HVAC system without ductwork
Remodel for existing McDonalds.
Replacement of complete existing central heat and air system with or without duct work PECAN PARK MH PARK PHS 1 SPACE 112
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work Remove existing Furnace and replace with a Goodman - Remove Both plenums and install new plenums - Remove all existing duct work for the downstairs unit - Redesign new duct work lay out and replace install.
New Construction Office Whse spec - Building 6 - Concurrent Review: SP-2022-0136C
Replacement of complete existing central heat and air system with or without duct work unit 225
Kitchen and bath updates in place; fixture flooring and tile replacement. Tankless water heater install with venting/electrical AC plenum replacement subpanel upgrade. Gas line cap and fireplace insert/surround removal. Eliminate partition between vanity/shower in hall bath. No changes to footprint or structural/ load framing
Replacement of complete existing central heat and air system with or without duct work HVAC change out
Addition/Remodel Addition of 430 sqft to include kitchen living room bedroom and laundry room/ Interior Remodel (full scope on app)
Bldg. 1: New 3 story SFR w/ 4 bedrooms 3.5 bathrooms attached carport and porch
Replacement of complete existing central heat and air system with or without duct work
Interior finishes and fixtures replace storefront doors
Replacement of complete existing central heat and air system with or without duct work
New 1-story single family residence 4 bed/3.5 bath attached garage covered porch and covered patio green building
New 2-story single family residence 4 bed/4.5 bath with attached garage covered porch and patio
Replacement of complete existing central heat and air system with or without duct work
Mechanical HVAC Installation
Mechanical HVAC Installation
Mechanical HVAC Installation
Mechanical HVAC Installation
Install 30 gallon gas water heater. 6 months gas inspection.
Install a new gas system for a new 2 story hotel.
mechanical
mechanical
mechanical
EQUIPMENT USE (CARS A&B): INSTALLATION OF DUAL 7000# CAPACITY PERSONNEL HOISTS DURING BLDG ALTERATION FILED SEP. HOISTS SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. ELEV APPL SUB TO ELEV DEPT.
EQUIPMENT USE (CARS C&D): INSTALLATION OF DUAL 7000# CAPACITY PERSONNEL HOISTS DURING BLDG ALTERATION FILED SEP. HOISTS SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. ELEV APPL SUB TO ELEV DEPT.