Search Permits
11,840 results · type: mechanical
Renovations to existing public elementary school including finishes reroofing plumbing fixtures HVAC envelope sealing new theatre curtain at stage and replacement of outdated fire alarm system components. RRISD - Fees Waived
Bldg #2 New 1-story dwelling unit/pool house 1 bath kitchen living space and covered patios
Master Bathroom Remodel: frame new shower pan size frame new shampoo niche frame new window opening frame new closet door entrance from bedroom and closet bathroom opening and close existing door update plumbing and electrical layout as per plan relocate plumbing fixtures as per plan new 4 recessed lights
mechanical
mechanical
mechanical
mechanical
INSTALLATION OF 6000 LB SINGLE PERSONNEL HOIST CAR (SOUTH) AS PER PLANS DURING CONSTRUCTION. HOIST SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
INSTALLATION OF TEMPORARY ENGINEERED ENCLOSURE SYSTEM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY
INSTALLATION OF TEMPORARY ROOF PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
INSTALLATION OF TEMPORARY ROOF PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
INTERIOR RENOVATION, INSTALL A.C. SYSTEM AT BEAUTY SALON OF EXISIGN 1-STORY BUILDING WITH GENERAL CONSTRUCTION WORK AND MECHANICAL WORK AS PER PLANS FILED HEREWITH. RELATED PLUMBING WORK WILL BE FILED SUBSEQUENTLY. NO CHANGE IN USE, EGRESS OR C OF O.
INSTALLATION & USE OF HOIST AS PER DRAWINGS ATTACHED HEREWITH
Direct replacement of a rooftop 5-ton compressor condenser unit on existing steel dunnage
INSTALLATION OF TEMPORARY ENGINEERED ENCLOSURE SYSTEM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY
sadas
Installation of temporary material hoist per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
USE OF MECHANICAL DEMOLITION EQUIPMENT DURING PARTIAL DEMOLITION, FILED SEPARATELY UNDER M01394813-I1
Installation of temporary needle beam per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
INSTALLATION OF TEMPORARY CHUTE AS PER PLANS.NO CHANGE IN USE, EGRESS OR OCCUPANCY.
INSTALLATION OF TEMPORARY ROOF WATER TOWER ROOF/ OVERHEAD PROTECTION AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
INSTALLATION OF 6000 LB SINGLE PERSONNEL HOIST CAR (NORTH) AS PER PLANS DURING CONSTRUCTION. HOIST SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
Direct replacement of a rooftop 6.5-ton and 10-ton HVAC package unit on existing roof curbs. Installation of a new 2.5 ton mini split unit on existing steel dunnage.
PROPOSED CONSTRUCTION RENOVATION AT CELLAR, 1ST AND 2ND FLOOR AND MECHANICAL WORK TO INSTALL NEW HVAC SYSTEM. WORK AS PER PLAN. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. NO CHANGE TO BUILDING ENVELOPE OF FLOOR AREA.
COMMERCIAL COOKING VENTILATION SYSTEM TO BE UPGRADED. NEW MUA HOOD WITH EXHAUST/MUA DUCTS & EXHAUST/MUA FANS TO BE INSTALLED. FIRESTOPPING WILL NOT BE DISTURBED. NO OTHER WORK PROPOSED. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
REMOVAL AND INSTALLATION OF DUCT WORK, DIFFUSERS, FANS AND RELATED MECHANICAL PIPING AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Mechanical modifications taking place on the 31st floor (32nd floor Marketing) as indicated on the drawings.
Mechanical changes as indicated on plans.
RELOCATING KITCHEN EXHAUST HOOD, EXHAUST/MUA DUCTS & EXHAUST/MUA FANS AT EXISTING PIZZERIA. FIRESTOPPING WILL NOT BE DISTURBED. NO OTHER WORK PROPOSED. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Replacement of complete existing central heat and air system with or without duct work