PermitDig

Search Permits

11,718 results · type: mechanical

Replacement of complete existing central heat and air system with or without duct work

4410 DOVEHILL DR, AUSTIN
Sep 28

Replacement of complete existing central heat and air system with or without duct work Like for like 2.5 ton horizontal gas

3406 MENCHACA RD UNIT 36, AUSTIN
Sep 28

Replacement of complete existing central heat and air system with or without duct work Like for like 3.5 ton vertical gas

1504 COLONY CREEK DR, AUSTIN
Sep 28

Residential Expedited Review - Addition and Remodel to Existing 2-Story Single Family Res. [4bed 5bath] Work to include addition of second unit on second floor first floor addition new beds new baths [1bed 2.5bath] and garage increase.

2416 VISTA LN, AUSTIN
Sep 28

Replacement of complete existing central heat and air system with or without duct work Like for like 2.5 ton horizontal gas

3913 BRONCO BEND LOOP, AUSTIN
Sep 28

Replacement of complete existing central heat and air system with or without duct work

2308 KEEPSAKE DR, AUSTIN
Sep 28

ePlan: Commercial Expedited Review - New Construction of Retail Building including Convenience Store and lease Space for Future Tenants (11000 SF).

7734 MC KINNEY FALLS PKWY, AUSTIN
Sep 28

Replacement of complete existing central heat and air system with or without duct work Like for like 2.5T horizontal gas

1707 WATERSTON AVE BLDG B, AUSTIN
Sep 28

Replacement of complete existing central heat and air system with or without duct work Like for like 2T vertical greenspeed heatpump

1708 NEWTON ST UNIT B, AUSTIN
Sep 28

mechanical

8319 QUINCY STREET, Norfolk
0KSep 28

Installation of a temporary Material storage per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.

450 WEST END AVENUE, Manhattan
3KSep 28

INSTALLATION OF TEMPORARY MATERIAL HOIST ON OUTRIGGERS PER PLAN SUBMITTED. WORK SHALL COMPLY WITH 2022 BUILDING CODE CHAPTER 33. NO CHANGE IN USE, EGRESS AND/OR OCCUPANCY WITH THIS APPLICATION.

262 5 AVENUE, Manhattan
3KSep 28

INSTALLATION OF TEMPORARY NEEDLE BEAM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY SHALL COMPLY WITH CHAPTER#33 OF 2022 THE NY BUILDING CODE.

729 VAN SINDEREN AVENUE, Brooklyn
1KSep 28

EQUIPMENT USE: DUAL 7500 # CAPACITY PERSONNEL HOISTS DURING NB CONST, FILED SEP. HOISTS SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. ELEVATOR APPLICATION SUBMITTED SEPARATELY

1920 TURNBULL AVENUE, Bronx
10KSep 28

Installation and use of temporary telehandler construction equipment as per plans filed herewith. This application is filed in conjunction with NB Q01007052-I1.

32-03 HARPER STREET, Queens
5KSep 28

Installation of a temporary Material hoist per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.

220 EAST 60 STREET, Manhattan
3KSep 28

INSTALLATION OF TEMPORARY ESCALATOR RIGGING SYSTEM AS PER PLANS DURING GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. RIGGING SYSTEM TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2022.

60 WALL STREET, Manhattan
10KSep 28

INSTALLATION OF ENGINEERED ENCLOSURE SYSTEM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SHALL COMPLY WITH CHAPTER#33 OF 2022 NYC BUILDING CODE.

602 ST NICHOLAS AVENUE, Manhattan
3KSep 28

EQUIPMENT USE: SINGLE 7000 # CAPACITY PERSONNEL HOIST DURING NB CONST, FILED SEP. HOIST SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. ELEVATOR APPLICATION SUBMITTED SEPARATELY

105 WEST 108 STREET, Manhattan
10KSep 28

EQUIPMENT USE: SINGLE 7000 # CAPACITY PERSONNEL HOIST DURING BLDG DEMOLITION, FILED SEP. HOIST SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. ELEVATOR APPLICATION SUBMITTED SEPARATELY

11 EAST 44 STREET, Manhattan
10KSep 28

TEMPORARY HOIST RUN-BACK STRUCTURE DURING NEW BLDG CONSTRUCTION, FILED SEPARATELY. HOIST RUN-BACK STRUCTURE SHALL COMPLY WITH CH #33 OF THE NYC BLDG CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. HOIST & ELEVATOR APPL SUBMITTED SEP

1920 TURNBULL AVENUE, Bronx
2KSep 28

Installation of HVAC system as per plans filed herewith. Filed under NB# 321589474.

739 BLAKE AVENUE, Brooklyn
1KSep 28

INSTALLATION OF TEMPORARY SYSTEM SCAFFOLD STAIR TOWER AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.

12 EAST 69 STREET, Manhattan
1KSep 28

INSTALLATION OF TEMPORARY ROOF PROTECTION AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.

15 EAST 77 STREET, Manhattan
1KSep 28

Installation of temporary storage of material on top of existing sidewalk shed (Filed under M01396143-I1-SH) per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.

343 MADISON AVENUE, Manhattan
3KSep 28

TEMPORARY HOIST RUN-BACK STRUCTURE DURING BLDG DEMOLITION, FILED SEPARATELY. RUN-BACK STRUCTURE SHALL COMPLY WITH CH #33 OF THE NYC BLDG CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. HOIST & ELEVATOR APPL SUBMITTED SEP

11 EAST 44 STREET, Manhattan
2KSep 28

HEREWITH TO FILE INTERIOR MECHANICAL ALTERATIONS INCLUDING REMOVAL AND INSTALLATION OF HVAC COMPONENTS DUCT WORK, VAV BOXES AND ASSOCIATED AIR DISTRIBUTION. NO CHANGES IN OCCUPANCY USE, GROUP OR EGREESS UNDER THIS APPLICATION.

730 3 AVENUE, Manhattan
132KSep 28

Modifications to the existing HVAC system, including the removals and ducts & piping on the 3rd & 4th Floors (BNY), as per plans. No change to use, egress, or occupancy.

240 GREENWICH STREET, Manhattan
250KSep 28

Replacement of air conditioning units. No change in use egress and occupancy.

155 EAST 31 STREET, Manhattan
30KSep 28

Replacement of two (2) existing roof top HVAC split system condenser units. No change to use, egress or occupancy.

1845 WEBSTER AVENUE, Bronx
23KSep 28