Search Permits
197,763 results
Change of Use from Religious Assembly to Admin/Bus Office with minor interior remodel. 2026-012346 DA
EV Charger
Express - Foundation Repair
ERAC Corp. Wall Sign
***Timed Virtual Inspection: 06/30/2026 @ 8 AM*** Replacement of complete existing central heat and air system with or without duct work
Unit B - New construction of 2 story duplex (attached condo) each with 2 beds and 2.5 baths attached 2 car garage
Express: Replace 4 existing windows - size for size
Replace service + meter can
Replacement of complete existing central heat and air system with or without duct work
ETJ - Plumbing for Commercial Building in the ETJ (sq ft 24072) Master Meter - 2024 042409 W
ePlan: Commercial Expedited Review - Change of Use from Meat Market Butcher shop to Restaurant with Retail and Added New Deck Area (3872 SF)
Addition and remodel. Total reconfiguring of interior/full interior remodel expand area of new kitchen at rear of structure enclose area under front covered porch to create new entry and breakfast areas increase garage by 3 at opening
New construction of 2 story sfr condo with 3 beds 2.5 baths and attached 2 car garage PUD
Interior alteration of an existing office space including a new demising wall to create separate suites 260 & 265 - (2) applications Suite 265
Replacement of complete existing central heat and air system with or without duct work
Install a full lawn sprinkler system for unit a
EXPRESS: Tub to shower conversion in master bathroom Replace walls in shower
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
Home builders loop Ref: 2026-034084 EP
Installed a PRV and whole home water shutoff valve for the water main line located in the yard
New construction single-family residential 2-story 4 bedroom 3.5 bath with attached 2-car garage covered front porch and covered rear patio.
Homebuilder Loop Austin 2 Mile ETJ Austin Energy
NEW 1 STORY SINGLE-FAMILY RESIDENCE ATTACHED GARAGE COVERED PORCH AND PATIO 4/2
90 tunnel below the foundation to replace entire drain system.3 access holes - front left right
Addition to existing SFR to enclose existing rear porch and new uncovered wood deck. Reduction of existing impervious cover to bring lot into IC compliance.
Galloway 3312 A Right New - 1 Story SFR CONDOMINUM w/ 3 bedrooms 2 bathrooms attached 2 car garage covered entry porch and patio FFE: 685.66 Site Plan: SP-2021-0328C Site Plan Exp.: 01/09/27 Max Bld height: 21-10 Actual Bld height: 21-10 required parking: 2.
Replacement of complete existing central heat and air system with or without duct work INSTALL NOTES: Replace 2 ton heat pump - upflow in closet on second floor. Alink. Replace zoning. Remove old pads and install new pad with bricks under. Install the primary controller downstairs and the secondary sensor upstairs.
WUI Zone C - Reroofing in Wildland Urban Interface Installing Class A Fire Rated Material OC Duration and OC Underlayment mesh on ventilation openings.
car charger 50 amp circuit with surge protector