Search Permits
11,840 results · type: mechanical
INSTALLATION AND USE OF TEMPORARY KNUCKLEBOOM AS PER PLANS FILED HEREWITH. NO CHANGES IN USE, EGRESS, OR OCCUPANCY
INSTALLATION OF TEMPORARY OVERHEAD PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
INSTALLATION AND USE OF MINI/SPYDER CRANE AS PER PLANS SUBMITTED. MINI/SPYDER CRANE SHALL COMPLY WITH CHAPTER #33 OF NYC BUILDING CODE. THIS APPLICATION INVOLVES NO CHANGE IN OCCUPANCY, USE OR EGRESS.
TEMPORARY WORK PLATFORM AS PER DRAWINGS. WORK PLATFORM SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Installation of a temporary roof protection and overhead protection via shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
INSTALLATION OF TEMPORARY PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY SHALL COMPLY WITH CHAPTER#33 OF 2022 THE NY BUILDING CODE.
NO WORK APPLICATION TO CORRECT TYPO IN CERTIFICATE OF COMPLIANCE FOR EXISTING UNITS FILED UNDER APPLCIATION # B01301902-I1. NO CHANGE IN EGRESS OR OCCUPANCY.
INSTALLATION AND USE OF TEMPORARY KNUCKLEBOOM AS PER PLANS FILED HEREWITH. NO CHANGES IN USE, EGRESS, OR OCCUPANCY
INSTALLATION AND USE OF TEMPORARY CONCRETE PLACING BOOM. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
INSTALLATION OF TEMPORARY PERSONNEL HOIST AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
INSTALLATION OF TEMPORARY OVERHEAD PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
INSTALLATION OF TEMPORARY ROOF PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SHALL COMPLY WITH CHAPTER#33 OF 2022 NYC BUILDING CODE.
MECHANICAL WORK TAKING PLACE ON THE 15TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Modifications to the existing HVAC system on the the 3rd and 4th floors (Piper Sandler) as per plans. No changes to Use, Egress, or occupancy.
Demolition if interior ductwork and related mechanical equipment on 46th floor
FILING TO PROTECT NEIGHBOR DURING MINOR FACADE REPAIR WORK. THIS SYSTEM IS A SITE SPECIFIC ENGINEERED ENCLOSURE SYSTEM SUBJECT TO THE REQUIREMENTS OF BC 3309.17. NO CHANGE IN USE, EGRESS, OR OCCUPANCY
INTERIOR RENOVATION OF EXISTING ONE FAMILY HOUSE. MODIFY NON-LOAD BEARING PARTITION WALLS. INSTALL MINI SPLIT AC MACHINES. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Filing herewith mechanical demolition work as per plans filed herewith. (36th FL. Construction, 38th FL. Marketing) No change to use, egress or occupancy.
Removal of ACCU-1 and related components and refrigerant piping and replacing with Fan Coil Units and related components in apartment 2SW as shown on plan set filed herewith. No change in use, egress, or occupancy. Associated GC application #M01394200-S2
FILING FOR MECHANICAL WORK ASSOCIATED WITH INTERIOR RENOVATION OF 12, 13, AND 14TH FLOORS FOR MAREX OFFICE AS PER PLANS SUBMITTED HEREWITH.
Use of temporary hoisting equipment as per plans filed herewith.
Mechanical changes as per plans.
Mechanical modifications to the 3rd & 4th floor as per plans filed herewith. No change in use, egress, or occupancy.
ROOF TOP HVAC UNIT REPLACEMENT FOR EXISTING BUILDING AS PER PLANS HERE WITHIN. NO CHANGE TO EGRESS, USE OR OCCUPANCY.
New construction of 3 story SFR Condo with 2 car garage covered patio and 2nd floor balcony
New 2 Story Secondary Dwelling with covered porch 1/1
Addition 1812 sq ft to garage and suite/two office spaces.
New two-story SFR *PRODUCTION BUILDER- GREEN BUILDING*
Interior finish out (Building 21)
New construction of 2 story sfr with 4 beds 3.5 baths opt study covered patio upper patio and entry with 2 car garage PUD