Search Permits
197,763 results
Replacement of complete existing central heat and air system with or without duct work HVAC Replacement
2026/06/11 - 2026/07/19 | Austin stands at a pivotal moment. In a year when the FIFA World Cup transforms North America into the center of global attention our city a capital of creativity innovation and cultural convergence deserves a worldclass celebration that reflects its identity. Austin was not selected as a host city but that reality does not diminish its spirit; instead it fuels our determination to deliver the most ambitious technically flawless and communitydriven unofficial World Cup
200amp meter base and riser replacement we will also replace the surge protector and add a gas bond. Electric Company: Austin Energy
EXPRESS: Existing foundation repair as per scope of work attached.
Change of use from vacant office to medical office put new vinyl floors repaint walls.
Express: Tub to shower conversion in master replace water heater replace exhaust fan in master
Express- Replace drywall that was removed for plumbing and electrical repairs. Replace insulation. Tub and shower conversion. Replace 1 entry door of the same size. Plumbing and electrical permits have been issued.
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
QT PV - Rooftop Solar. Backfed breaker interconnection AT EXISTING MULTIFAMILY - OVA SMART Housing
Tunnel/Sewer line repair underneath the foundation of the home removing damaged piping replacing with PVC roughly 35ft
Replacement of complete existing central heat and air system with or without duct work
Replacement of an existing water heater extend gas line to reach new water heater
Replacement of condenser only
Home builders loop Ref: 2026-034086 EP
Express- Replace drywall that was removed for plumbing and electrical repairs. Replace insulation. Tub and shower conversion. Replace 1 entry door of the same size. Plumbing and electrical permits have been issued.
Replacement of complete existing central heat and air system with or without duct work
New pool (180 sqft) at the rear of residence. pool near the Critical Root Zones of three protected/heritage trees.
Replacement of complete existing central heat and air system with or without duct work
NEW 2 STORY SINGLE-FAMILY RESIDENCE ATTACHED GARAGE COVERED PORCH AND PATIO 4/3
***Timed Virtual Inspection: 07/06/2026 @ 10 AM*** Replacement of complete existing central heat and air system with or without duct work
New construction of 2 story SFR 4 bedroom 4.5 bath w/ attached 2 car garage covered front porch and covered patio. PUD
Unit A - New construction of 2 story duplex (attached condo) each with 2 beds and 2.5 baths attached 2 car garage PUD
First Time Finish Out for Suite 1102
Total demo of a SFR 1312 sq ft built 1950 ***The building shall not be demolished until after the contractor has fulfilled the neighbor notification requirements outlined in Steps 5 & 6 of the Demolition webpage. ***
Replacement of complete existing central heat and air system with or without duct work
QT PV - Rooftop Solar. Line side tap interconnection AT EXISTING MULTIFAMILY - OVA SMART Housing
Replacement of complete existing central heat and air system with or without duct work