Search Permits
197,763 results
Replacement of complete existing central heat and air system with or without duct work LIKE FOR LIKE: 3 Ton Two Stage Vertical Gas System
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work LIKE FOR LIKE: 2.5 ton horizontal gas system
Replacement of complete existing central heat and air system with or without duct work Install replacement of 5 Ton AC System
New construction of a 2-story single family dwelling in a condo regime. 4 Bedrooms 3.5 bathrooms with attached 2 car garage
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
New two-story SFR *PRODUCTION BUILDER- GREEN BUILDING* 4 bed 3.5 bath with attached garage front covered porch and rear covered patio
Express: Replace windowsdoors s4s.Gut kitchen&baths&all drywallinsulation as needed.New HVAC&ductwork.New elec fixtures & subpanel and main panel if needed.New plumbing fixtures. No walls or plumbing moving
New inground swimming pool and spa w/ reqd enclosure device for existing 2-story single family residence.
Fire Damage Repair drywall framing and roofing no changes in floor plan Revision1: Add EP MP PP
Express: Vehicle damage repair
Main breaker replacement
Plumbing for New Construction of SFR in the ETJ 2039 sq ft
Interior remodel from retail space to office space. New windows in kitchen area. New entry courtyard with ADA ramp. Lighting changes and new mechanical system added.
T- POLE for 3006 Fruth St
Replacement of complete existing central heat and air system with or without duct work LIKE FOR LIKE: 3 Ton Horizontal Gas System
Replacement of complete existing central heat and air system with or without duct work
New construction of 1 story sfr with 4 beds 3 baths with attached garage covered porch and patio PUD
Replacement of complete existing central heat and air system with or without duct work
***Timed Virtual Inspection: 06/22/2026 @ 8 AM*** Replacement of complete existing central heat and air system with or without duct work
TEMPORARY BUILDING PERMIT scope of permit is limited to in slab plumbing
Replacement of an existing water heater Water heater located at garage
Replacement of complete existing central heat and air system with or without duct work
Expedited Review - New Autofill Pool
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work HVAC changeout: Remove and replace existing 2.5-ton vertical split system.
Construct new driveway approach of 26.5FT and sidewalk of 14 LF(ADA ramp) SP-2024-0282CX 2025 085952 000 00 SSI
Replacement of complete existing central heat and air system with or without duct work LIKE FOR LIKE: 2 Ton Gas Horizontal System