Search Permits
11,840 results · type: mechanical
Interior plumbing updates Structural wall modifications to accommodate a new floor plan Minor exterior framing adjustments at the front entry New roof installation to decking
Express: Replacing the existing windows for the same size and location include new trim if needed. Repair and replace sections of rotten fascia and soffit new flooring interior paint. REVISION 1: add MEPs for tub-to-shower conversion kitchen remodel interior/exterior electrical panel upgrades A/C changeout water heater changeout
New Construction- 2 story SFR 3 bed 2.5 bathroom and attached garage
New 2-story single family residence 4 bed/3.5 bath attached garage covered porch and covered patio Green Building
New construction of 2 story Duplex Condo each with 3 beds 2.5 baths and attached garage (8100 and 8102 bird song) - Unit B
Replacement of complete existing central heat and air system with or without duct work Removed the old unit and installed 1 new HVAC system without ductwork
Replacement of complete existing central heat and air system with or without duct work **RUDY ALBACHTEN: Replace existing 4-ton horizontal gas furnace system like-for-like; no structural change.
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
ePlan: Residential Expedited Review - Interior Remodel to Existing 2-Story Single Family Res. [5bed 4bath] Work to include: Reconfiguration of Living Kitchen Bath. Replacement of Doors/Windows. New Half bath [5bed 4.5bath]
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work Replacement of HVAC system.
mechanical
mechanical
MECHANICAL MODIFICATIONS TAKING PLACE ON THE 18TH FLOOR CONSTRUCTION (19TH FLOOR MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY
INSTALLATION OF DEBRIS CHUTE AT 40 HAVEN AVENUE, MANHATTAN NY 10032 AS PER INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
EQUIPMENT USE: SINGLE 7000 # CAPACITY PERSONNEL HOIST DURING BLDG DEMOLITION, FILED SEP. HOIST SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. ELEVATOR APPLICATION SUBMITTED SEPARATELY
TEMPORARY NEEDLE BEAM SYSTEM AS PER DRAWINGS. NEEDLE BEAM SYSTEM SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
INSTALLATION AND USE OF TEMPORARY KNUCKLEBOOM AS PER PLANS FILED HEREWITH. NO CHANGES IN USE, EGRESS, OR OCCUPANCY
Installation of temporary overhead protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Use of Knuckleboom for site servicing and miscellaneous materials deliveries. This application is filed in conjunction with NB Q01002920-S1
INSTALLATION OF TEMPORARY OVERHEAD PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Installation of Concrete pump as per plans filed herewith. No change in use, egress or occupancy.
Installation Of Temporary Dual Personnel Hoists As per Plans Submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Installation of a temporary Material hoist per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
INSTALLATION OF ENGINEERED ENCLOSURE SYSTEM AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER # 33 OF THE 2022 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Installation of a temporary Material storage per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
INSTALLATION OF TEMPORARY CHUTE AS PER PLANS.NO CHANGE IN USE, EGRESS OR OCCUPANCY.
REPLACE (2) HVAC SPLIT SYSTEM AND (1) ROOFTOP HVAC UNIT AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
Herewith Filing Modifications to existing mechanical system in conjunction with office build-out/ renovations as per plans. No change in Use, Egress or Occupancy is proposed under this application.