Search Permits
11,840 results · type: mechanical
Harrison S356 B Right New - 2 Story SFR w/ 5 bedrooms 3 bathrooms attached 2 car garage covered entry porch and patio required parking: 2.
Randall 3314 C Right New - 2 Story SFR CONDOMINUM w/ 3 bedrooms 2.5 bathrooms attached 2 car garage covered entry porch and patio FFE: 684.95 Site Plan: SP-2021-0328C Site Plan Exp.: 01/09/27 Max Bld height: 30-9 Actual Bld height: 30-9 required parking: 2.
Replacement of complete existing central heat and air system with or without duct work Vyasar Ganesan: Replace 3-ton like-for-like system
New two-story single family attached row house 3 bedroom/2.5 bathroom with covered porch driveway and sidewalk SMART Housing Green Building
Replacement of complete existing central heat and air system with or without duct work ANTHONY
Replacement of complete existing central heat and air system with or without duct work Replacement of HVAC system.
ePlan: Residential Expedited Review - New construction of a 2-Story Single Family Res. [4bed 5.5bath] with Attached Carport.
New two-story single family attached row house 3 bedroom/2.5 bathroom with covered porch driveway and sidewalk SMART Housing Green Building
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
New construction of a 1-story Accessory structure [1bath]
Replacement of complete existing central heat and air system with or without duct work hvac change out
Replacement of complete existing central heat and air system with or without duct work hvac change out
Express - Tub to shower conversion. Rewiring of branch circuitry for three rooms Revision-Mechanical and plumbing work
BLDG 1: New construction of a -Story Single Family Res. [4 bed 3.5 bath] with Attached 2-car Garage.
mechanical
mechanical
HEREWITH FILING FOR MECHANICAL MODIFICATIONS ON THE ROOF AS PER PLANS. NO CHANGE TO USE OCCUPANCY OR EGRESS.
Mechanical modifications taking place on the 32 construction /33 marketing floor as per plans filed herewith. No change in use, egress or occupancy
INSTALLATION AND USE OF TEMPORARY KNUCKLEBOOM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE EGRESS, OR OCCUPANCY.
HEREWITH FILING FOR MECHANICAL MODIFICATIONS ON THE ROOF AS PER PLANS. NO CHANGE TO USE OCCUPANCY OR EGRESS.
Installation of temporary roof protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
demolition of interior ductwork and associated mechanical equipment on floors 26, 27.
Modifications to the existing HVAC system on the 1st floor (Insta 360) as per plans. No change to use, egress or occupancy.
Installation of a temporary Material hoist per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
PROTECTION PLATFORM DURING DEMO. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
EXISTING TWO-FAMILY HOUSE WITH MECHANICAL WORK AT CELLAR, BASEMENT, 1 ST, 2ND FLOOR AND ROOF. JOB FILED TO RELATED TO ALT2APPLICATION # B01301132-I1.2. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY
EQUIPMENT USE: SINGLE 6000 # CAPACITY PERSONNEL HOIST DURING NB CONST, FILED SEP. HOIST SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. ELEVATOR APPLICATION SUBMITTED SEPARATELY
LVZ SYSTEM UPGRADE-- INSTALLATION OF NEW OUTSIDE AIR FAN AND RELATED MER EQUIPMENT UPGRADES AS PER PLANS FILED. No change to use, egress or occupancy.
Place & Use of an Articulating boom truck equipment for hoisting materials in conjunction of new Building construction as per NYC Chapter #33 of 2022 code. No change in Use, Egress or Occupancy under this application.