Search Permits
7,268 results · type: mechanical
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work LIKE FOR LIKE: 3.5 Ton Vertical Heat Pump System
Replacement of complete existing central heat and air system with or without duct work LIKE FOR LIKE: 4 Ton 2 Stage Horizontal Gas System
Replacement of complete existing central heat and air system with or without duct work Chilled water air handler with electric heat
ePlan: Commercial Expedited Review - Interior Remodel for Core Improvements for Future Finish Out. Not For Occupancy (38623 SF).
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work Install replacement of 4 Ton AC System
Replacement of mini-split system garage space
Interior remodel to existing business admin office. Access Control requested.
ePlan: Residential Expedited Review - Addition and Remodel to Existing Detached Garage. Work to include: Garage conversion to Accessory to Primary.
ePlan: Expedited Review - [APPROVED] New Construction of a 5-Story Multi-Family Bldg. - Fire Area 1 - 2 level Podium with 11 Units Leasing Mail Fitness Center and Bike Storage (22606 SF).
Replacement of complete existing central heat and air system with or without duct work
537 sq ft Addition of bedroom and bathroom Expired Permit 2023-108682 BP (express replace windows as needed) rolled into current scope of work
ePlan: Expedited Review - [APPROVED] New Construction of a 5-Story Multi-Family Bldg. - Fire Area 1 - contains Dog Wash (117170 SF).
Replacement of complete existing central heat and air system with or without duct work
Express- Fire loss upstairs bathroom. Engineer report attached. Rebuild back to like kind and quality prior to the loss of the fire. Framing repair upstairs some electrical rewire HVAC replacement plumbing
ePlan: Expedited Review - [APPROVED] New Construction of a 5-Story Multi-Family Bldg. - Fire Area 2 - contains Level 1 Pool Equipment Room Level 5 Sky Lounge and Terrace (152142 SF). 135 UNITS
ePlan: Expedited Review - [APPROVED] New Construction of a 3-Story Parking Garage (131138 SF).
Replacement of complete existing central heat and air system with or without duct work Replace evaporator coil and condenser.
Replacement of complete existing central heat and air system with or without duct work LIKE FOR LIKE: 3 Ton Horizontal Gas System
Replacement of complete existing central heat and air system with or without duct work Install new 2-Ton Goodman 14.3-SEER Electric AC & 96% Gas Heating System
***Timed Virtual Inspection: 06/03/2026 @ 11 AM*** Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
Addition of a living room and dining area at the back of the current house. We will also be expanding and converting the garage to a primary suite. Outside well add a deck and 10x20 in ground pool. For the existing house well be running new electrical and plumbing.
ePlan: Commercial Expedited Review - Interior Remodel to include Tenante Improvements for Future Ross Dress For Less Retail Store (27277 SF).
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work Install replacement of 3.5 Ton AC System and Repair Or Rebuild Of The Supply Air Plenum
Replacement of complete existing central heat and air system with or without duct work hvac change out