Search Permits
11,840 results · type: mechanical
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work LIKE FOR LIKE: 1.5 Ton Horizontal Gas System
Replacement of complete existing central heat and air system with or without duct work Remove and replace existing 2-ton vertical gas furnace/AC system with like-for-like equipment; no structural change.
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
Existing space modifications for new equipment for Floor 3
Replacement of Complete duct system only LIKE FOR LIKE: 3.5 Ton Horizontal Gas LIKE FOR LIKE: 3.5 Ton Horizontal Gas **TWO SYSTEM CHANGE OUT**
First Generation Restaurant Tenant Improvement within an existing 1-story shell building.
Replacement of complete existing central heat and air system with or without duct work Replacement of HVAC system.
Replacement of complete existing central heat and air system with or without duct work Replacement of HVAC system without duct work for Unit 138
Replacement of complete existing central heat and air system with or without duct work
7 DAY - interior tenant finish out of a first generation office space - OVA
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work LIKE FOR LIKE: 1.5 Ton Vertical Heat Pump (basement unit)
New 2-story single family residence 4 bed/4.5 bath attached garage covered porch and patio Green Building
New construction single-family residential 2-story 5 bedroom 4.5 bath with study flex room attached 2-car garage covered front porch and covered rear patio.
Replacement of complete existing central heat and air system with or without duct work Replacement of HVAC system.
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
New 2-story single family dwelling condo 4 Bed/3.5 bath with attached garage and covered patio
mechanical
TEMPORARY ROOF / OVERHEAD PROTECTION AT THE ADJOINING PROPERTIES DURING NB CONSTRUCTION FILED SEP. ROOF / OVERHEAD PROTECTION SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OREGRESS UNDER THIS APPLICATION.
Mechanical modifications taking place on the 1st floor and cellar as per plans filed herewith. No change in use, egress or occupancy
TEMPORARY SHORING AS PER DRAWINGS. SHORING SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Use of equipment listed to process debris on ground as per plans filed herewith.