Search Permits
16,912 results · type: electrical
Installation of 60amp circuit for a 48amp EV Charging Station
NEW DETACHED WOOD FRAME GARAGE
New Construction- 2 story SFR 5bed 4.5bath with attached garage and covered porch patio
Homebuilders loop for New SFR ref 2026-089898 BP. Austin LTD -Bluebonnet
New construction single-family residential 1-story 5 bedroom 4.5 bath with attached 3-car garage covered front porch and covered rear patio.
Exterior improvements fence generator pad ramp. Plans will be submitted as a deferred submittal. Access control requested. (Application 2).
ePlan: Residential Expedited Review - New Pool. Bldg 3
ePlan: Residential Expedited Review - New TWO UNIT RES. Bldg 1 New construction of a 2-Story Single Family Res. [3bed 2.5bath] with Attached Carport
ePlan: Residential Expedited Review - New construction of a 3-Story Single Family Res. [3bed 2.5bath] with Attached Carport. Bldg 2
Temporary Power Loop Ref 2026-067997 BP
*Green Building* New 1-story 3 bedroom 3 bathroom single family residence with attached garages covered front porch and rear covered patio.
PB: New construction of 2 story sfr - 4 beds 2.5 baths 2 car garage and covered patio
ePlan: Residential Expedited Review - New construction of a 2-Story Single Family Res. [3bed 2bath] with Attached Carport. Bldg 1
Pflugerville ISD public school remodel to change out like for like RTUs split systems kitchen vent hood - fees waived
Homebuilders loop for New SFR ref 2026-091110 BP. Austin LTD -Bluebonnet
Rooftop Solar with Line Side Tap Interconnection.
New construction of 2 story SFR Condo with 5 or 6 bed option 5.5 baths covered patio covered porch and covered front deck with 3 car attached tandem garage
ePlan: Residential Expedited Review - New Pool. Bldg 1
INTERIOR REMODEL PHASE 2 OF EXISTING OFFICE SPACE
Temporary Power for Construction Trailer
New Pool over existing pool deck
Bldg. 2: NEW SECONDARY UNIT WITH 2 BEDROOMS AND 1.5 BATHROOMS
New construction of 2 story sfr with 4 beds 4.5 baths attached 3 car garage covered entry porch and patio PUD
New in ground pool (312 sqft) and concrete deck (415 sqft)
TEMPORARY TPOLE FOR NEW CONSTRUCTION IN EASTON PARK ref. 2026-035903 BP
NEW CONSTRUCTION OF 3-UNIT SIPS PANEL FRAMED THREE STORY 4 Bed 4.5 bath
New two-story SFR with attached garage covered porch and covered outdoor living space 5/5 *PRODUCTION BUILDER- GREEN BUILDING*
Remodel (occupied) within an existing single story industrial commercial building for limited warehouse and distribution use. No exterior improvements existing to remain. No high pile storage. No access control. No plumbing. (Bldg. 1)
Installation of a new internally illuminated channel letter sign for Success Tutoring
Bad Polaris tap arcing cables need to replace