Search Permits
7,268 results · type: mechanical
Replace 2.5 ton air handler and condenser
6 month vacancy. Install gas cock on line. Gast test needed. 1 water heater, 1 stove, 1 dryer
Install Two 10 Ton and One 5 ton Roof top units with Gas Heat. Install two kitchen hoods with grease ducts. Install Freezer and cooler walking boxes with equipment. Install two ice machines with Remote condensers.
INSTALL A GAS LINE WITH 2 DROPS, STOVE,HWH.INSTALL A GAS HWH
File permit for out over six months.
File permit for out over six months.
File permit for out over six months.
3 TON ELECTRIC AIR HANDLER CONDENSER DUCTWORK
Separating 1 meter into 2. Run 10 feat of galvanized pipe, pressure test, inspect
Electric water heater installed
Mike Coles plumbing will be running a new gas line for 1 pool heater. Heater gas line was damaged due to lightning strike. High pressure and meter increase will be requested.
Electric water heater installed
mechanical
mechanical
mechanical
mechanical
mechanical
mechanical
Mechanical changes as indicated on plans.
INSTALLATION OF TEMPORARY NEEDLE BEAMS AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER # 33 OF THE 2022 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Use of Material Platform for building construction. This application is filed in conjunction with NB X00871979-I1
Use of Placing Boom for building construction. This application is filed in conjunction with NB X00871979-I1
INSTALLATION OF TEMPORARY ROOF PROTECTION AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Installation and use of temporary knuckleboom as per plans filed herewith. No change in use, egress, or occupancy.
TEMPORARY WORK PLATFORM AS PER DRAWINGS. WORK PLATFORM SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
INSTALLATION OF TEMPORARY STORAGE AS PER PLAN. THERE IS NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
INSTALLATION OF TEMPORARY OVERHEAD PROTECTION AS PER PLAN. THERE IS NO CHANGE IN USE, EGRESS, OR OCCUPANCY. THE OVERHEAD PROTECTION ON THE 219 EAST 44TH STREET BUILDING SOUTH ELEVATION 2ND FLOOR TERRACE.
EQUIPMENT USE: INSTALLATION OF A TEMPORARY PERSONNEL HOIST (CAR # 2) AS PER PLANS IN CONJUNCTION WITH NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. HOIST INSTALLED IN ACCORDANCE WITH 2022 NYC BUILDING CODE, CHAPTER 33.
REMOVAL AND INSTALLATION OF DUCTWORK, DIFFUSERS, FANS AND RELATED MECHANICAL PIPING. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
NYT-RECONFIGURATION OF COGEN HEAT REJECTION SYSTEM INCLUSIVE OF SILENCER REPLACEMENT AND RELATED MECHANICAL PIPING MODIFICATIONS AS PER PLANS FILED.