Search Permits
18,566 results · type: plumbing
Total demo of sfr 2069 sqft circa 1936
Total Demo of SFR 1326 sqft circa 1941
repair gas leak at the shut off on a gas fireplace
Excavate 15 tunnel to repair main drain line under the house
Upgrade Ice machine. [7 Day Review]
Replacement of an existing water heater Replace 30gal electric water heater with new 40g electric water heater Unit 202
Replacement of an existing water heater Replace 50 Gallon Natural Gas Water Heater
ePlan: Residential Expedited Review - New construction of a 2-Story Single Family Res. [4bed 4.5bath] with Attached Garage. Bldg 3
Per Tx Gas we need to relocate the gas meter away from the doorway windows and crawl space vents. Moving the line to the side of the house where its in compliance with all clearances.
Installing a new irrigation system
ePlan: Residential Expedited Review - New construction of a 1-Story Single Family Res. [1bed 1.5bath] with Attached Garage and Attached Carport. Unit 1A
New construction multi-family in the etj 48186.14 sqft 5 floors 58 units
Per Tx Gas they are going to repair a gas leak on their line and while the line is temporarily down they want us to move the gas meter 10 feet out to the edge of the building and remove from the covered location its currently at.
1.replace second gas flex line to stove that currently has a black gas flex line that is leaking 2. Bring Existing water heater up to code
New Service for SFR in ETJ. 3144 sq ft.
1702AR NEW 1 STORY 4 BEDROOM 2 BATH SINGLE FAMILY RESIDENTIAL HOME WITH ATTACHED GARAGE COVERED FRONT PORCH AND REAR PATIO
Replacement of an existing water heater Change Out: Install/ Replace 50 gallon tank-type natural gas water heater.
15 tunnel below the pier and beam foundation to replace the entire drain system. excludes kitchen and utility drain lines. 1 access hole in front
Plumbing for New SFR in the ETJ (sq ft 2301)
12 tunnel below the foundation to spot repair both bathroom drain lines. 1 access hole in back
New construction multi-family in the etj 45513.98 sqft 4 floors 42 units
Installing a new irrigation system
Gas Test & Bringing existing water heater up to code
New construction multi-family in the etj 68334.01 sqft 5 floors-81 units
28ft Tunnel at bldg A
The proposed project of site improvement to an existing multifamily (senior living) community. Work includes selective demolition and replacement of existing sidewalks to provide ADA and TAS compliant accessibility routs as well as repaving of existing parking areas striping and details as needed to meet current accessibility standards. An existing storage shed will be removed. Widening existing front porch on HC units only community building. All interior work is contained entirely withing the
New construction of 2 story sfr with 5 beds 4 baths attached 3 car garage covered porch and patio
Express- Removal of existing primary shower and installation of new walk-in shower.
ePlan: Residential Expedited Review - New 1-story Duplex; Unit B 1-story SF Res [3bed 2bath]
Excavate 35 tunnel to repair main drain line under the house