Search Permits
11,840 results · type: mechanical
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work LIKE FOR LIKE: 5 Ton 2 Stage Vertical Gas System
Replacement of complete existing central heat and air system with or without duct work
mechanical
mechanical
mechanical
mechanical
Mechanical work on the 25th floor as indicated on drawings.
FILE MECHANICAL WORK TO INSTALL (8)SPLIT HVAC UNITS AT ROOF OF PUBLIC SCHOOL Q460 FOR 1ST FLOOR CAFETERIA. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
TEMPORARY OVERHEAD PROTECTION AS PER DRAWINGS. OVERHEAD PROTECTION SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
INSTALLATION OF DUCTWORK, DIFFUSERS, FANS AND RELATED MECHANICAL PIPING AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
INSTALLATION OF TEMPORARY PERSONNEL HOIST AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Installation Of Temporary Single Personnel Hoist As per Plans Submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Installation of temporary overhead protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
REPLACMENT OF TWO ROOFTOP CONDENSING UNITS WITH A TOTAL CAPACITY OF 10 TONS. NO CHANGE TO EGRESS, USE, OR OCCUPANCY.
INSTALLATION OF TEMPORARY ROOF PROTECTION PER PLAN SUBMITTED. WORK SHALL COMPLY WITH 2022 BUILDING CODE CHAPTER 33. NO CHANGE IN USE, EGRESS AND/OR OCCUPANCY WITH THIS APPLICATION.
Modifications to the existing HVAC System: Demo and Installation of new exhaust ductwork, diffusers, grilles, dampers and piping on the Cellar (CO)/ C1 (Mkg) as per plans (RG - Concourse Project.) No change to use, egress or occupancy.
EQUIPMENT USE: SINGLE 6000 # CAPACITY PERSONNEL HOIST DURING NB CONST, FILED SEP. HOIST SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. ELEVATOR APPLICATION SUBMITTED SEPARATELY
FILE MECHANICAL WORK TO INSTALL (4)FOUR SPLIT HVAC UNITS AT ROOF OF PUBLIC SCHOOL Q460 FOR 1ST FLOOR GYM. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
INSTALLATION AND USE OF TEMPORARY KNUCKLEBOOM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE EGRESS, OR OCCUPANCY.
TEMPORARY HOIST RUN-BACK STRUCTURE DURING NEW BLDG CONSTRUCTION, FILED SEPARATELY. HOIST RUN-BACK STRUCTURE SHALL COMPLY WITH CH #33 OF THE NYC BLDG CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. HOIST & ELEVATOR APPL SUBMITTED SEP
Mechanical work as shown on plans in conjunction with GC work type.
Modification to existing mechanical system related to apartment renovation.
EXISTING LAUNDROMAT INTERIOR RENOVATION. REPLACE WASHING MACHINE AND INSTALLATION OF HVAC SPLIT SYSTEM UNITS.NO CHANGE TO USE EGRESS OR OCCUPAN
MECHANICAL SYSTEMS MODIFICATIONS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, BULK, EGRESS, OR OCCUPANCY IS PROPOSED.
Mechanical work in conjunction with leading GC filing. Mechanical work to include new VAV box and ducts.
Removal of existing 100 tons package unit and installation of new (5) 20 tons water source heat recovery systems to connect to (25) 4-way cassettes in the existing physical culture establishment.
APT. # 14-E, REPLACE EXISTING CONDENSING AND FAN COIL UNITS WITH NEW. REPLACE EXISTING CONDENSING SLEEVES. NO CHANGE IN EGRESS, OCCUPANCY, OR USE.
FILING FOR MECHANICAL WORK AS PER PLANS INCLUDING INSTALLATION OF TYPE 1 HOOD AND KITCHEN EXCHAUST SYSTEM AT BASEMENT
NYU SUNSET PARK DENTAL PRACTICE & SUPPORT SPACES - MECHANICAL MODIFICATIONS AS PER PLANS FILED HEREWITH IN CONJUNCTION WITH NEW BUILDING APPLICATION B08029487-I1.