PermitDig

Search Permits

11,840 results · type: mechanical

Replacement of complete existing central heat and air system with or without duct work

4600 W GUADALUPE ST UNIT 202, AUSTIN
Jul 16

Replacement of complete existing central heat and air system with or without duct work LIKE FOR LIKE: 5 Ton 2 Stage Vertical Gas System

6801 TOWNSHIP TRL, AUSTIN
Jul 16

Replacement of complete existing central heat and air system with or without duct work

4704 MARBLEHEAD DR, AUSTIN
Jul 16

mechanical

119 MARCY STREET, Norfolk
0KJul 16

mechanical

9605 18TH BAY STREET, Norfolk
0KJul 16

mechanical

3350 LOAM STREET, Norfolk
0KJul 16

mechanical

9610 HAMMETT PARKWAY, Norfolk
0KJul 16

Mechanical work on the 25th floor as indicated on drawings.

595 MADISON AVENUE, Manhattan
252KJul 16

FILE MECHANICAL WORK TO INSTALL (8)SPLIT HVAC UNITS AT ROOF OF PUBLIC SCHOOL Q460 FOR 1ST FLOOR CAFETERIA. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.

35-01 UNION STREET, Queens
120KJul 16

TEMPORARY OVERHEAD PROTECTION AS PER DRAWINGS. OVERHEAD PROTECTION SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.

1484 1 AVENUE, Manhattan
2KJul 16

INSTALLATION OF DUCTWORK, DIFFUSERS, FANS AND RELATED MECHANICAL PIPING AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.

1212 6 AVENUE, Manhattan
4KJul 16

INSTALLATION OF TEMPORARY PERSONNEL HOIST AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.

22 MOUNT HOPE PLACE, Bronx
6KJul 16

Installation Of Temporary Single Personnel Hoist As per Plans Submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.

215 WEST 76 STREET, Manhattan
Jul 16

Installation of temporary overhead protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.

6 EAST 74 STREET, Manhattan
4KJul 16

REPLACMENT OF TWO ROOFTOP CONDENSING UNITS WITH A TOTAL CAPACITY OF 10 TONS. NO CHANGE TO EGRESS, USE, OR OCCUPANCY.

1 DAVIS AVENUE, Staten Island
35KJul 16

INSTALLATION OF TEMPORARY ROOF PROTECTION PER PLAN SUBMITTED. WORK SHALL COMPLY WITH 2022 BUILDING CODE CHAPTER 33. NO CHANGE IN USE, EGRESS AND/OR OCCUPANCY WITH THIS APPLICATION.

343 MADISON AVENUE, Manhattan
4KJul 16

Modifications to the existing HVAC System: Demo and Installation of new exhaust ductwork, diffusers, grilles, dampers and piping on the Cellar (CO)/ C1 (Mkg) as per plans (RG - Concourse Project.) No change to use, egress or occupancy.

1271 AVENUE OF THE AMERICAS, Manhattan
500KJul 16

EQUIPMENT USE: SINGLE 6000 # CAPACITY PERSONNEL HOIST DURING NB CONST, FILED SEP. HOIST SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. ELEVATOR APPLICATION SUBMITTED SEPARATELY

1056 42 STREET, Brooklyn
10KJul 16

FILE MECHANICAL WORK TO INSTALL (4)FOUR SPLIT HVAC UNITS AT ROOF OF PUBLIC SCHOOL Q460 FOR 1ST FLOOR GYM. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.

35-01 UNION STREET, Queens
60KJul 16

INSTALLATION AND USE OF TEMPORARY KNUCKLEBOOM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE EGRESS, OR OCCUPANCY.

937 BEDFORD AVENUE, Brooklyn
1KJul 16

TEMPORARY HOIST RUN-BACK STRUCTURE DURING NEW BLDG CONSTRUCTION, FILED SEPARATELY. HOIST RUN-BACK STRUCTURE SHALL COMPLY WITH CH #33 OF THE NYC BLDG CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. HOIST & ELEVATOR APPL SUBMITTED SEP

1056 42 STREET, Brooklyn
3KJul 16

Mechanical work as shown on plans in conjunction with GC work type.

395 9 AVENUE, Manhattan
62KJul 16

Modification to existing mechanical system related to apartment renovation.

1165 FIFTH AVENUE, Manhattan
79KJul 16

EXISTING LAUNDROMAT INTERIOR RENOVATION. REPLACE WASHING MACHINE AND INSTALLATION OF HVAC SPLIT SYSTEM UNITS.NO CHANGE TO USE EGRESS OR OCCUPAN

121-02 IRWIN PLACE, Queens
72KJul 16

MECHANICAL SYSTEMS MODIFICATIONS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, BULK, EGRESS, OR OCCUPANCY IS PROPOSED.

527 MADISON AVENUE, Manhattan
20KJul 16

Mechanical work in conjunction with leading GC filing. Mechanical work to include new VAV box and ducts.

450 WEST 33 STREET, Manhattan
5KJul 16

Removal of existing 100 tons package unit and installation of new (5) 20 tons water source heat recovery systems to connect to (25) 4-way cassettes in the existing physical culture establishment.

80-02 KEW GARDENS ROAD, Queens
400KJul 16

APT. # 14-E, REPLACE EXISTING CONDENSING AND FAN COIL UNITS WITH NEW. REPLACE EXISTING CONDENSING SLEEVES. NO CHANGE IN EGRESS, OCCUPANCY, OR USE.

101 CENTRAL PARK WEST, Manhattan
35KJul 16

FILING FOR MECHANICAL WORK AS PER PLANS INCLUDING INSTALLATION OF TYPE 1 HOOD AND KITCHEN EXCHAUST SYSTEM AT BASEMENT

322 EAST 116 STREET, Manhattan
50KJul 16

NYU SUNSET PARK DENTAL PRACTICE & SUPPORT SPACES - MECHANICAL MODIFICATIONS AS PER PLANS FILED HEREWITH IN CONJUNCTION WITH NEW BUILDING APPLICATION B08029487-I1.

602 60 STREET, Brooklyn
871KJul 16