PermitDig

Search Permits

4,292 results · type: electrical

Electrical

844-844A Beacon ST, Boston
5KJun 22

Electrical

844-844A Beacon ST, Boston
5KJun 22

Electrical

844-844A Beacon ST, Boston
5KJun 22

Electrical

844-844A Beacon ST, Boston
5KJun 22

Electrical

844-844A Beacon ST, Boston
5KJun 22

Electrical

559 Hyde Park AV, Roslindale
10KJun 22

Electrical

10 Littledale ST, Roslindale
3KJun 22

PERMIT IS ONLY FOR INSTALLATION OF ONE SOLAREDGE ENERGY BANK 10KWH BATTERY. ALL WORK TO BE PERFORMED PER 2018 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHA

561 W ENID AVE, Mesa
Jun 22

PERMIT IS ONLY FOR INSTALLATION OF ONE TESLA POWERWALL3 BATTERY AND EXPANSION PACK. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY

1741 W BEDFORD ST, Mesa
Jun 22

PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEE

8123 E LAKEVIEW AVE, Mesa
Jun 22

INSTALLATION OF A 60 AMP DEDICATED CIRCUIT BREAKER FOR A TESLA WALL CONNECTOR VEHICLE CHARGER IN THE GARAGE. EXISTING 200 AMP SERVICE METER. ELECTRICAL SHALL BE INSTALLED PER MANUFACTURES SPECIFICATIONS AND COMPLY WITH 2024 IBC, 2023 NEC AND SRP STANDARDS.

857 S DEL RANCHO, Mesa
Jun 22

Installation of roof mounted solar PV system SYSTEM SIZE: DC SIZE : 12 X 440W=5.280 kW DC AC SIZE : 1 X 7600W=7.600 kW AC (12) SEG SOLAR SEG-440-BTD-BG(440W) [BLK] MODULES (1) TESLA 7.6 KW INVERTER (MODEL NO-1538000-XX-Y) (2) FRANKLINWH APOWER 2 15KWH BATTERY (MODEL NO:aPOWER X-20) (1) FRANKLINWH METER ADAPTER CONTROLLER (1) 200A BATTERY COMBINER PANEL (1) 125A SUB SERVICE PANEL (1) ISLANDDER METER SOCKET ADAPTER (V-1-A-6)

2862 E VIRGINIA ST, Mesa
Jun 22

electrical

732 CAROLINA AVENUE, Norfolk
0KJun 22

electrical

1340 37TH STREET, Norfolk
0KJun 22

electrical

1738 LASALLE AVENUE, Norfolk
0KJun 22

electrical

3600 TIDEWATER DRIVE, Norfolk
1KJun 22

electrical

932 HARRINGTON AVENUE, Norfolk
0KJun 22

electrical

3731 BRENNAN AVENUE, Norfolk
0KJun 22

electrical

2414 MALTBY AVENUE, Norfolk
0KJun 22

electrical

1149 WINBURNE LANE, Norfolk
0KJun 22

Electrical

40-42 Codman Hill AV, Dorchester
30KJun 19

Electrical

120-126 Emerson ST, South Boston
53KJun 19

Electrical

17 Forest ST, Roxbury
2KJun 19

Electrical

41 West ST, Boston
25KJun 19

Electrical

112-118 Fulton ST, Boston
11KJun 19

Electrical

1 Federal ST, Boston
220KJun 19

Electrical

36-44 Broad ST, Boston
275KJun 19

Electrical

1 Federal ST, Boston
135KJun 19

PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEE

10863 E OBISPO AVE, Mesa
Jun 19

Installation of 200 Amp electric service - no plans required. Installation shall comply with City of Mesa codes and servicing electric utility requirements. DO NOT DISCONNECT UTILITY WIRES OR METERS. Schedule disconnect/reconnect with serving utility and obtain utility service requirements specific to your permit.

458 N GRAND, Mesa
Jun 19