Search Permits
16,912 results · type: electrical
Install additional 2.64 kW DC rooftop solar system and an additional 10.0 kWh energy storage system to existing residential
New pool and spa (with plumbing permit)
REBUILD SERVICE DUE TO DAMAGED PANEL. AE REMOVED SERVICED AND REQUESTED COMPLETE REBUILD NEED EMERGENCY RECONNECT DUE TO PROPERTY IS OCCUPIED DURING EXCESSIVE HEAT
Interior remodel Removing single hung window and 1 panel door and replacing it with a 2 panel hinged door with header moving 2 outlets and 1 light switch
New inground pool/spa with required enclosure and concrete deck (heater or autofill). Removing existing attached wood deck and replacing with concrete
*Partial Demo* Interior remodel Bathroom remodel to add tub and refresh master suite.
New two-story SFR *PRODUCTION BUILDER*
BASE: Installing a backup battery system and additional meter socket.
New single-story SFR *PRODUCTION BUILDER* with attached garage covered porch and patio 3/2
Upgrade Main Breaker on Pedestal to 200amps
CHANGE OF USE from office to dental officeinterior finish-out to add demising walls between existing office suites to create Suite 206 along with an interior remodel
New detached 2-story condominium residence with 3 bedrooms 2.5 bathrooms and an attached 2 car garage covered porch. SP-2021-0233C
electrical_permit_(r)
electrical_permit_(r)
electrical_permit_(r)
electrical_permit_(r)
electrical_permit_(r)
Replacement of 200 Amp (or less) electric panel AND RELOCATION. Installation shall comply with THE 2024 IRC, 2023 NEC, City of Mesa amendments and servicing electric utility requirements.
PERMIT IS ONLY FOR INSTALLATION OF ONE TESLA POWERWALL 3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEES
PERMIT IS ONLY FOR INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEES AN
electrical
electrical
Service Only. New 600amp UG Service for new residence.
Interior remodel to existing Lt manufacturing areas.
Remodel for new design center in existing office unit. Scope of work is 3645 SF of Unit 300. Unit 300 in total is 25487 SF
Retroactive permit of Pool and Spa ***CONTAINER POOL***SLC 10/23/2025
(Jackson Christopher) - INSTALLATION OF CIRCUIT FOR ELEC. VEHICLE CHARGING STATION - ESIP
Prewire & Install Level 2 EV Charger
Exterior work only site work for ADA accessible route porch to be re-built for future ADA access from future lift. No interior work future tenant will apply for their own permit.
temporary tpole for new construction in Wildhorse