Search Permits
11,840 results · type: mechanical
Installation of a temporary Material hoist per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Installation Of Temporary Material Hoists As per Plans Submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
INSTALLATION OF TEMPORARY ROOF PROTECTION AS PER PLANS. TEMPORARY PROTECTION SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
INSTALLATION OF TEMPORARY PLATFORM, AND ROOF, SKYLIGHT, AND OVERHEAD PROTECTION AS PER PLANS. TEMPORARY EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
EQUIPMENT USE: INSTALLATION OF A TEMPORARY PERSONNEL HOIST COMPLEX AS PER PLANS IN CONJUNCTION WITH NB CONSTRUCTION . NO CHANGE IN USE, EGRESS OR OCCUPANCY. HOIST INSTALLED IN ACCORDANCE WITH CHAPTER 33 OF 2022 NYC BUILDING CODE.
Mechanical plans filed herewith to show interior alteration within tenant space (Suite 11). New air volume terminals, new ductwork supply/return diffusers, & new exhaust fans. No change to use, egress, or occupancy.
REMOVAL AND INSTALLATION OF NEW VRF CONDENSING UNIT, AND INSTALLATION OF NEW REFRIGERATION SYSTEM.
FILE MECHANICL WORK TYPE TO INSTALL(4) NEW SPLIT CONDENSERS UNIT ON REAR YARD GENERAL CONSTRUCTION WILL BE FILING SEPARATD APPLICATION, NO CHANGE OF USE,EGRESS OR OCCUPANCY
TO REGISTER THE EXISTING COMMERCIAL KITCHEN EXHAUST HOODS AND EXHAUST DUCT AND FAN AS PER PLAN FILED HEREWITH. NO CHANGE OF USE, EGRESS OR CERTIFICATE OF OCCUPANCY.
DISCONNECT EXISTING ROOFTOP UNIT FROM GAS SUPPLY LINE, ELECTRICPOWER & DUCT SYSTEM. REMOVE EXISTING ROOFTOP UNITS. INSTALL PACKAGED GAS ROOFTOP UNITS ON EXISTING DUNNAGE SUPPORT. CONNECT NEW ROOFTOP UNITS TO EXISTING GAS SUPPLY LINE, ELECTRICPOWER & Duct.
APPLICATION FILED FOR MECHANICAL ADDITIONS/MODIFICATIONS IN THE CELLAR, BASEMENT, 1ST, 2ND, 3RD FLOORS & ROOF AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
MODIFICATION TO EXISTING HVAC SYSTEMS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
MODIFICATION OF EXISTING HVAC DUCTS AND DIFFUSERS ON THE 28TH FLOOR. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Replacement of complete existing central heat and air system with or without duct work LIKE FOR LIKE: 4 Ton Vertical Gas System
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
ePlan: Commercial Expedited Review - Interior Remodel to Existing 2nd Level Areas in Hospital Phase II.
Replacement of complete existing central heat and air system with or without duct work
Addition/ remodel to include: Converting existing 4-plex to 2-Unit use duplex. Unit A: 3 bedroom 2 bath with front covered porch rear covered balcony and addition of foyer & HVAC closet. EXISTING 4-PLEX TO BE RENOVATED AND TURNED INTO A DUPLEX. TOTAL INTERIOR REMODEL PLUS SOME ADDED CONDITIONED SPACE. EXISTING DECK TO BE REFRAMED AND EXTENDED. EXISTING ROOF TO BE DEMOLISHED COMPLETELY AND REBUILT. NEW CURB CUT.
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work HVAC changeout/Alteration
Replacement of complete existing central heat and air system with or without duct work
ePlan: Commercial Expedited Review - Tenant Improvement Scope of Work to include Interior Build out and Changes to Store Front (136946 SF)
Replacement of complete existing central heat and air system with or without duct work