Search Permits
16,912 results · type: electrical
ePlan: Expedited Review - New Carport (846 SF)
(Phillips Clint) - INSTALLATION OF CIRCUIT FOR ELEC. VEHICLE CHARGING STATION - ESIP
New inground swimming pool w/ reqd enclosure device for existing 1-story single family residence.
(Hebert Gnossos) - INSTALLATION OF CIRCUIT FOR ELEC. VEHICLE CHARGING STATION - ESIP
14.11 kw DC solar installation on a new construction residential roof with a 20 kwh battery backup.
Minor interior remodel of an existing building to allow child day care occupancy.
ePlan: Expedited Review - New Carport (846 SF)
1360AL NEW 1 STORY 3 BEDROOM 2 BATH SINGLE FAMILY RESIDENTIAL HOME WITH ATTACHED GARAGE COVERED FRONT PORCH
ePlan: Expedited Review - New Carport (846 SF)
New construction single-family residential 1-story 4 bedroom 2 bath with covered front porch covered rear patio and covered exterior storage.
Demo unpermitted front porch rear sun room and extra drive way approach CAUTION: code enforcement violation notated asbestos tiles installed in closet. Spoke with the builder and informed him we will need a 3rd party inspection report uploaded to the building permit attachments noting that all asbestos has been removed and the property is safe to enter prior to any inspection. -CM 6/24/26
Temporary Builder Loop Ref 2026-055448 BP
ePlan: Expedited Review - New Carport (846 SF)
Interior remodel of existing space. Demo and install new partition walls new finished and lighting fixtures. Existing business offices.
Homebuilders loop for New SFR ref 2026-088944 BP. Austin LTD -Bluebonnet
ePlan: Expedited Review - New Carport (846 SF)
ePlan: Expedited Review - New Carport (846 SF)
Build a 200 amp stand alone electric service for a Spectrum CATV power supply enclsoure
electrical_permit_(r)
PERMIT IS ONLY FOR INSTALLATION OF ONE TESLA POWERWALL 3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEES
Install 24kw, 306000 BTU generator, sub panel, transfer switch, and dedicated gas line. Minimum required building inspections: Gas underground, gas rough in and gas pipe final.
Installation of 200 Amp electric service - no plans required. Installation shall comply with City of Mesa codes and servicing electric utility requirements. DO NOT DISCONNECT UTILITY WIRES OR METERS. Schedule disconnect/reconnect with serving utility and obtain utility service requirements specific to your permit. We will replace your existing 200amp 120/240volt Main Electrical Panel with a new 200amp 120/240volt All-In-One electrical panel, the new panel will be PV ready.
electrical
electrical
electrical
electrical
7.36kW rooftop solar install
New pool
TruTec will be running a new 60 amp Circuit from panel around the house hardwired into a Tesla Charger for rebate.
Replace existing overhead service with new 200 AMP overhead service new 200 AMP meter can new 200 AMP main breaker load center additional grounding and whole house surge protection