Search Permits
11,840 results · type: mechanical
Replacement of complete existing central heat and air system with or without duct work Change the equipment inside and outside only
New construction of 2 story SFR
ePlan: Residential Expedited Review - Addition and Remodel to Existing Single Family Res. work to include interior remodel vault kitchen ceiling bathroom renovations new bathroom and new uncovered deck
ePlan: Residential Expedited Review - New construction of a 2-Story Single Family Res. [5bed 5bath] with Attached Garage.
mechanical
HEREWITH FILING FOR MODIFICATION TO THE EXISTING MECHANICAL SYSTEM ON THE 1ST &2ND FLOOR AS PER PLANS. NO CHANGE TO USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
INSTALLATION OF TEMPORARY ROOF PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Filing herewith for Installation of Grease Exhaust Duct (12 GA Black Iron), Type-I Hoods & PCU at Cellar Kitchen.
INSTALLATION OF TEMPORARY PERSONNEL HOIST AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy.
PLACEMENT AND USAGE OF MOBILE MINI CRANE DURING NB CONSTRUCTION (BIS # 421747097) AS PER PLAN SUBMITTED. WORK SHALL COMPLY WITH BC 2022. NO CHANGE IN USE, EGRESS AND/OR OCCUPANCY WITH THIS FILING.
INSTALLATION OF PLASTIC BARRIERS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY
Modifications to the existing HVAC system: Reconfigure existing ductwork, diffusers, VAV's and accessories on the SC2 (CO)/ C3 (Mktg) as per plans (Rock Group - Bike Room Project) No change to use, egress or occupancy.
Installation of temporary debris chute as per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
INSTALLATION OF TEMPORARY OVERHEAD PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Use of mechanical demolition equipment during partial demolition, filed separately under M01289549-I1.
Installation of engineered enclosure system for use during partial demolition, filed separately under M01289549-I1.
INSTALLATION OF TEMPORARY PERSONNEL HOIST AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
INSTALLATION OF A TEMPORARY NEEDLE BEAM SCAFFOLD AS PER PLANS DURING NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. NEEDLE BEAM SCAFFOLD TO COMPLY WITH 2022 NYC BUILDING CODE, CHAPTER 33.
INSTALLATION OF TEMPORARY ROOF PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SHALL COMPLY WITH CHAPTER#33 OF 2022 NYC BUILDING CODE.
Telehandler for building construction.
As approved by Borough Commissioner John Raine, we are filing an EMERGENCY GENERATOR ORIGINALLY PERMITTED AND INSTALLED UNDER INADVERTENTLY WITHDRAWN ALT 2 #100410878 MH WORK TYPE, TO SHOW EXISTING CONDITIONS APPROVED AND INSTALLED UNDER SUCH application.
APPLICATION FILED TO REPLACE EXISTING 7 TON ROOFTOP HVAC UNIT, NO CHANGE IN USE, OCCUPANCY OR EGRESS.
PATCH AND MATCH FOR DUCTWORK REROUTING PER PLAN CHANGES. No change in use, egress or occupancy.
Mechanical work as shown on plans
Installation Of Temporary Single Personnel Hoist As per Plans Submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
REPLACEMENT OF EXISTING DIFFUSERS AND ADDITION OF EXHAUST FAN FOR IT LOADS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Modifications to existing HVAC System as per plans filed herewith. Replacement of ductwork and air outlets for rebuilt ceilings. No change to use, egress, or occupancy.
Modifications to existing HVAC System as per plans filed herewith. Replacement of ductwork and air outlets for rebuilt ceilings. No change to use, egress, or occupancy.
Filing herewith mechanical/hvac infrastructure, including but not limited to hvac risers, AHUs, trunk ductwork off AHUs, etc. as per plans. No change in use, occupancy, or egress under this application.