Search Permits
16,912 results · type: electrical
PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEE
PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY AND ONE TESLA POWERWALL3 EXPANSION UNIT. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESU
PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEE
PERMIT IS ONLY FOR INSTALLATION OF ONE TESLA POWERWALL 3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEES
PERMIT IS ONLY FOR THE INSTALLATION OF TWO TESLA POWERWALL3 BATTERIES AND ONE EXPANSION PACK. B.E.S.S. SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 70 PER R327.4. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SC
PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY AND ONE TESLAPOWERWALL EXPANSION PACK. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT
electrical
electrical
electrical
electrical
Express: Replace 256 sqft of sheetrock in the garage bring the water heater to code install GFCIs in the bathroom and kitchen. Replace the front porch light.
Pool 38x18ft with autofil gas heater and automatic electric pool cover. Equipment pad 6x6ft (36 sq ft)
New in-ground 220 SF concrete pool along with associated equipment and pad.
Installation of GM Energy V2H (vehicle-to-home) charging system. Per guidance from Stuart Prior at AE we need to submit this interconnection application with inspection from AE under an Aux Power electrical permit because the hardware involves a UL 1741 grid-interactive device. AE wants to test the V2H functionality at final inspection to ensure effective isolation from the grid. GM Energy Home Hub to be powered by 125A breaker placed in existing main electric panel. GM Energy Powershift bidirec
ePlan: Expedited Review - New Carport (846 SF)
ePlan: Expedited Review - New Carport (846 SF)
Installation of a conveyor system inside of an existing customer warehouse - no mechanical electrical or plumbing work being conducted within this scope of work.
ePlan: Expedited Review - New Carport (846 SF)
Homebuilders loop for New SFR ref 2025-110881 BP. Austin LTD -Bluebonnet
Homebuilders loop for New SFR ref 2025-111940 BP. Austin LTD -Bluebonnet
New construction of a 2-story single family dwelling in a condo regime. 3-bedroom 2.5 bath with attached garage
New single-story SFR (3br/2ba) with attached garage covered porch and covered patio *PRODUCTION BUILDER- SMART HOUSING / GREEN BUILDING*
Homebuilders loop for New SFR ref 2025-156611 BP. Austin LTD -Bluebonnet
Move existing 200 amp overhead service to new 200 amp overhead free standing meter rack. Go underground back to existing house.
Relocation of two portable buildings within the same lot including the construction of deck ramps. SP-2023-0426C - Approved
New 1-story single family residence 4 bed/2 bath with covered porch and patio Smart Housing Green building
Install Level 2 EV Charger
Homebuilders loop for New SFR ref 2026-097003 BP. Austin Full purpose
Interior remodel replace fire pump controller. Scope is only replacing a single piece of fire protection equipment.
extend a circuit and add a new 120V outlet on the patio