Search Permits
2,734 results · type: residential
new construction of residential pool and spa
SCREEN ENCLOSURE
Private Provider Inspections- new pool enclosure on existing concrete footers for Differenza pool permit #HC-BLD-26-0084235
POOL ENCLOSURE OVER EXISTING POOL DECK
The project is a detached accessory structure with use of a study room, bathroom, and playroom with a wet bar.
Build (16) Group U occupancy garages totaling 22,351 SF Group B occupancy 768 SF Clubhouse, and Group U occupancy 256 SF Ramada. Apartment buildings by separate permits. All structure Type-VB construction with tile roofs, stucco finish, and post tension slabs. Deferred fire sprinklers and fire alarms. Aerial apparatus access code modification: PMT23-13606. As a result of C of O.
Building 1 R-2 occupancy V-A construction 19112 SF 16 apartments two 1 1/2" water meters 2 elect. meters Tile roofs, stucco finish, and post tension slabs. Deferred fire sprinklers and fire alarms. Aerial apparatus access code modification: PMT23-13606. See PMT23-14607 for civil work. As a result of C of O. See PMT22-06290C for deferred fire sprinklers and PMT22-06290B for deferred fire alarms.
Building 6 R-2 occupancy V-A construction 19112 SF 16 apartments, two 1 1/2" water meters 2 elect. meters Tile roofs, stucco finish, and post tension slabs. Deferred fire sprinklers and fire alarms. Aerial apparatus access code modification: PMT23-13606. Civil work was completed in phase 1. Deferred fire sprinklers and fire alarm under PMT22-06290C and PMT22-06290B. As a result of C of O.
Building 5 R-2 occupancy V-A construction 15348 SF 78 occupants 12 apartments 1 1/2" water meter 1 elect. meter. Tile roofs, stucco finish, and post tension slabs. Deferred fire sprinklers and fire alarms. Aerial apparatus access code modification: PMT23-13606. Civil work completed in phase 1. Deferred fire sprinklers and fire alarm under PMT22-06290C and PMT22-06290B. As a result of C of O.
Building 13: 3-story, type V-B construction, 32,966 SF, group R-2 occupancy and 5,383 SF, group U occupancy. Special inspection required for fabricator, steel, concrete, masonry, wood, soil, post tension slab. Deferred fire alarms and access control. Results in CoO. Ref: PMT24-07220 for primary permit.
Building 12: 3-story, type V-B construction, 25,273 SF, group R-2 occupancy and 3,976 SF, group U occupancy. Special inspection required for fabricator, steel, concrete, masonry, wood, soil, post tension slab. Deferred fire alarms and access control. Results in CoO. Ref: PMT24-07220 for primary permit.
Remove old roof and install a new fortified roof Once all applicable photos have been uploaded, please email Inspections@nola.gov requesting permit closure. PHOTOS REQUIRED 4 geotagged photos (one from each side) showing: Removal of existing roof material Installation of water intrusion resistant underlayment Installation of the drip-edge and flashing Installation of shingles or metal panels
Rear roof with asphalt shingles to fortified standards Once all applicable photos have been uploaded, please email Inspections@nola.gov requesting permit closure. PHOTOS REQUIRED 4 geotagged photos (one from each side) showing: Removal of existing roof material Installation of water intrusion resistant underlayment Installation of the drip-edge and flashing Installation of shingles or metal panels
Upper Main Roof Shingle Section Only - remove all layers of existing roof to expose decking, Roof Redeck - Install a 1/2" dx plywood decking over the existing decking where the shingle roof has been removed, install a self-adhering 4" strip over all plywood joints in the roof decking, Install the high temperature water barrier underlayment in the valleys and other designated areas of the roof, install one ply of synthetic felt, install new drip edge around entire perimeter of roof, instal
Addition and/or Alteration
Addition and/or Alteration
Addition and/or Alteration
Addition and/or Alteration
Make Safe Permit For RP
Addition and/or Alteration
New Construction
New Construction
Addition and/or Alteration
Addition and/or Alteration
Addition and/or Alteration
Addition and/or Alteration
Addition and/or Alteration
Addition and/or Alteration
Addition and/or Alteration
Addition and/or Alteration