Search Permits
191,917 results
New Construction of Community Bath House in ETJ
Finish out for multi-tenant corridor and restrooms.
this is for an overhead t pole at back of property ref. 2026-027542 BP
FIFTH THIRD BANK-E01 ILLUMINATED WALL SIGN ON THE SOUTH ELEVATION LOCATED AT 300 W 6TH STREET.
ADD AN ELECTRICAL POWER CONNECTION FOR AN ELECTRIC CAR
60X36 LOGO W/ WHITE ACRYLIC W/ BLUE VINYL 15 28 CHANNEL LETTER W/ RED ACRYLIC W/ 2X6 AND 2X8 WIREWAYS MOUNTED ON EXISTING WALL 3/16 WHITE BLUE AND RED ACRYLIC .040x5(d) BRONZE ALUMINUM RETURN 1 BLUE TRIM-CAP UL LIST LED MODULE IP-68 WHITE AND RED PRIMARY VOLTAGE 100-240V AC SECONDARY VOLTAGE 12V DC OUTPUT CURRENT 9.6 AMPS POWER SUPPYY IS NOT OVERLOADED NO SHORTS IN SECONDARY WIRING
Eastland S352 D Right New - 1 Story SFR w/ 4 bedrooms 2 bathrooms attached 2 car garage covered entry porch and patio required parking: 2.
Replacement of an existing water heater Replacement of 2 NG Water Heaters Like for Like
Replacement of an existing water heater changing out existing tank electric water heater for a similar model
New construction of 4 Plex Concurrent Review Request with Site plan Review Buildings 1357 9 and 10 S.M.A.R.T. Housing
60X36 LOGO W/ WHITE ACRYLIC W/ BLUE VINYL 28 CHANNEL LETTER W/ RED ACRYLIC W/ 2X8 WIREWAYS MOUNTED ON EXISTING WALL 3/16 WHITE AND RED ACRYLIC .040x5(d) BRONZE ALUMINUM RETURN 1 BLUE TRIM-CAP UL LIST LED MODULE IP-68 WHITE AND RED PRIMARY VOLTAGE 100-240V AC SECONDARY VOLTAGE 12V DC OUTPUT CURRENT 4.8 AMPS POWER SUPPYY IS NOT OVERLOADED NO SHORTS IN SECONDARY WIRING
ePlan: Residential Expedited Review - New construction of a 2-Story Single Family Res. [3bed 2.5bath] with Attached Garage. Bldg 2
New Construction of Community Bath House in ETJ
Replacement of complete existing central heat and air system with or without duct work
ePlan: Residential Expedited Review - New construction of a 1-Story Single Family Res. [4 bed 3bath] with Attached Garage covered porch/patio.
Fire damage repair. Interior drywall and insulation in one room
Replacement of an existing water heater
New construction of 2 story sfr condo with 4 beds 3 baths attached garage covered porch and covered patio (This will be a model home garage space will be used as sales office then converted back to garage space when sold)
New construction of 4 Plex Concurrent Review Request with Site plan Review Buildings 1357 9 and 10 S.M.A.R.T. Housing
ePlan: Residential Expedited Review - New construction of a 3-Story Single Family Res. [3bed 2.5bath] with Attached Carport. Bldg 2
Express: Tub to shower conversion
NEW 2 STORY SINGLE-FAMILY RESIDENCE ATTACHED GARAGE COVERED PORCH AND PATIO
Total demo of SFR 1109 sq ft circa 1942 ***The building shall not be demolished until after the contractor has fulfilled the neighbor notification requirements outlined in Steps 5 & 6 of the Demolition webpage.***
Estonian 3316 C Right New - 2 Story SFR CONDOMINUM w/ 4 bedrooms 3 bathrooms attached 2 car garage covered entry porch and patio FFE: 687.01 Site Plan: SP-2021-0328C Site Plan Exp.: 01/09/27 Max Bld height: 26-11 Actual Bld height: 26-11
Construct new driveway approach of 18 FT and sidewalk of 45 LF
Balboa S415 C Left New - 1 Story SFR w/ 4 bedrooms 3 bathrooms attached 2 car garage covered entry porch and patio required parking: 2.
Express: Tub to shower conversion
ETJ - upgrade old 200A to 320A single phase
Installation of 9.57 KW Solar PV System to roof of residence with 36.16 KWH ESS.
ePlan: Residential Expedited Review - New TWO UNIT RES Bldg 2 New construction of a 2-Story SF Res [3bed 2.5bath] with attached Carport