Search Permits
11,839 results · type: mechanical
mechanical
mechanical
mechanical
Installation of temporary material hoist as per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
INSTALLATION OF TEMPORARY SHORING AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
INSTALLATION OF OVERHEAD PROTECTION AND ROOF PROTECTION AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION
Installation of a temporary overhead protection and roof protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application
FILE MECHANICAL WORK TO INSTALL (10)TEN SPLIT HVAC UNITS AT ROOF OF PUBLIC SCHOOL Q460 FOR 1ST FLOOR GYM. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
INSTALLATION OF TEMPORARY ROOF PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
INSTALLATION OF TEMPORARY PERSONNEL HOIST AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
INSTALLATION OF A TEMPORARY ROOF PROTECTION AS PER PLANS DURING GENERAL CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. ROOF PROTECTION TO COMPLY WITH 2022 NYC BUILDING CODE, CHAPTER 33.
INSTALL OUTRIGGER BEAM ATTACHED TO SECANT CORE BEAM FOR PIPE SCAFFOLD INSTALLATION. OUTRIGGER BEAM SHALL COMPLY WITH CHAPTER # 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Installation of temporary needle beam per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Installation Of Temporary Single Personnel Hoist As per Plans Submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
INSTALLATION OF TEMPORARY PERSONNEL HOIST AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
INSTALLATION &USAGE OF MONORAIL SYSTEM WITH SUSP. SCAFF. AS PER DRAWINGS. MONORAIL WITH SUSP. SCAFF. SHALL BE INSTALLED AT ROOF BULKHEAD LEVEL. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SUSP. SCAFF. DOES NOT NEED PERMIT BC 3314.2, Ex.3
INSTALLATION OF PLACING BOOM. THIS APPLICATION INVOLVES NO CHANGE IN USE, OCCUPANCY OR EGREES.
TEMPORARY DEBRIS CHUTE AS PER DRAWINGS. DEBRIS CHUTE SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
FILE MECHANICAL IN CONJUNCTION WITH JOB #: B01288161-I1.
INSTALLATION AND USE OF TEMPORARY KNUCKLEBOOM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE EGRESS, OR OCCUPANCY.
Replacement of existing condensing units with new mounting on roof. Replacement of existing air handling units in existing equipment room on 3rd floor. Related lineset. All work in compliance with TPPN 5/98. No change to occupancy, use, or egress.
Removal of existing units and associated piping and ductwork on the 31st floor as per plans. No change to use, egress or occupancy.
Hereby filing to install new mechanical units with associated ductwork and piping as shown on plans filed herewith. No change to use, occupancy or egress.
Modifications to the existing HVAC system on the 16th floor (IQVIA) as per plans. No change to use, egress or occupancy.
Modifications to the existing HVAC system on the 37th floor as per plans. No change to use, egress or occupancy.
APPLICATION FILED FOR MECHANICAL ADDITIONS/MODIFICATIONS ON THE 16TH FL (HGF) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Alterations to mechanical system in 4th floor as per plans. No change to use, egress or occupancy.
Hereby filing to install mechanical units with associated ductwork and piping for office renovation as shown on plans filed herewith. No change to use, occupancy or egress.
Installation of a new split system and relocation of existing air handlers.
Application filed for replacing an AC condenser on existing steel dunnage on the roof, obtain certificate of compliance. No change to the use, egress or occupancy.