Search Permits
11,772 results · type: electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
PANEL UPGRADE SAME LOCATION
SOLAR PV WITH ESS
SOLAR PV WITH ESS
SOLAR PANELS-PHOTOVOLTAIC SYSTEM
SOLAR PV WITH ESS
PANEL UPGRADE SAME LOCATION
ELECTRICAL VEHICLE CHARGING STATION
This permit is to upgrade to a 225A MAIN PANEL SERVICE with installation of ONE SOLAREDGE HOME BATTERY 400V. Installation shall comply with City of Mesa codes and servicing electric utility requirements. Do not disconnect utility wires or meters. Schedule disconnect/reconnect with serving utility and obtain utility service requirements specific to your permit. Failure to schedule disconnect may result in additional utility trip charge fees and charges for any damage to distribution equipment.
PERMIT IS ONLY FOR AN UPGRADE TO A 225AMP SERVICE AND THE INSTALLATION OF ONE TESLA POWERWALL 3. B.E.S.S. SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 70 PER R327.4. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR
PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEE
Demo existing split meter/distribution panel and replace with junction box. Install new 200 AMP 120/240V Single Phase overhead SES on the NE corner of house. Additionally, install new grounding electrode system consisting of (1) 4 cu to cold water pipe riser from new SES supplemented by two ground rods driven to a depth of 8 feet at minimum 6 feet apart. Bond GAS if applicable. Lastly, back feed all existing branch circuits in new junction box using 3/4-inch EMT raceways with not more than 9 cur
Installation of 200 Amp electric service - no plans required. Installation shall comply with City of Mesa codes and servicing electric utility requirements. DO NOT DISCONNECT UTILITY WIRES OR METERS. Schedule disconnect/reconnect with serving utility and obtain utility service requirements specific to your permit.
Pelican Electrical a permit that we feel is urgent. Client has been experiencing power interruptions, Entergy has been on site and confirmed it is not in their wires. Upon Pelican's inspection of the property, we found that the service needed to be updated and replaced. Major problem is current service has no neutral. The 125Amp is full and cannot accept surge protection. Pelican will all with a new 200Amp Eaton service up to code and will fix neutral problem and reground service.
Emergency Reconnect. Top of Stem was detached from home. Repair was made with new conduit and service head. After hours on Friday.
Upgrading service to 200 amps. No new circuits.
Install electrical wiring 14 new circuits 100 amps Construction loop must be filed separately
Required electrical work for individual apartment renovation 20 new circuits 125 amps
Property is move-in ready but needs the smart electrical meter turned back on.
6 mo vacancy permits and inspections with NOLA
Needing a vacancy permit and inspection as soon as possible Nia Mosley 504-452-1338
6mo vacancy permit and inspections with NOLA
file for 6 month vac
New Service, Reconnect and repairs