Search Permits
16,909 results · type: electrical
New pool (with plumbing permit). New Battery Backup 336 SF New generator enclosure 259 SF.
Homebuilders loop for New SFR ref 2026-093340 BP. Austin LTD -Bluebonnet
BASE: Installing a backup battery system and additional meter socket.
New construction of 2 story sfr with 4 beds 3.5 baths attached 2 car garage covered entry porch and patio PUD
construction of Gunite swimming pool
T Pole
Blau 39-99733 - Disconnect/reconnect power to tie in PV component and upgrading MSP to _200__ Amps. _200__ Main Breaker. Upgrading revenue meter to 200 Amps.
New pool and spa for single family residence.
Material Bespoke Stone+Tile
The wrong meter can was installed we used a 3 phase commercial meter and replaced it with a single phase residential meter.
BASE: Installing a backup battery system and additional meter socket.
7 DAY - REMODEL EXISTING OFFICE AMENITY AREA - OVA
Creekline Sign B South Elevation
New construction security fence and installation of prefabricated guard booth. 2026 065074 DA - Pending
electrical_permit_(r)
electrical_permit_(r)
electrical_permit_(c)
electrical_permit_(r)
electrical_permit_(r)
electrical_permit_(r)
electrical_permit_(r)
electrical_permit_(r)
electrical_permit_(r)
PERMIT IS ONLY FOR INSTALLATION OF ONE TESLA POWERWALL 3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEES
Add new electrical to garage including installation of one 220V 30A breaker and outlet for an air compressor, installation of three new 120V receptacles on a new 20A circuit for miscellaneous tools, replacement of three existing light fixtures with six new LED light fixtures, and replacement of the existing lighting breaker with an AFCI breaker.
PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEE
PERMIT IS ONLY FOR INSTALLATION OF ONE TESLA POWERWALL 3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEES
electrical
electrical
electrical