Search Permits
16,709 results · type: electrical
REPLACING A FEW CIRCUITS, OTC APPROVED PER RICH LEMCKE. RELATED TO COB26-00057.
400amp panel upgrade in new location. 200amp sub panel installed at existing panel location.
PERMIT IS ONLY FOR AN UPGRADE TO A 225AMP SERVICE AND THE INSTALLATION OF ONE TESLA POWERWALL 3. B.E.S.S. SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 70 PER R327.4. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR
Replacement of 200 Amp (or less) electric panel - no plans required. Installation shall comply with City of Mesa codes and servicing electric utility requirements. DO NOT DISCONNECT UTILITY WIRES OR METERS. THE ACT OF SELF DISCONNECTING UTILITY WIRES OR METERS IS PROHIBITED AND MAY CAUSE DAMAGE OR INJURIES. Failure to schedule disconnect may result in additional utility trip charge fees and charges for any damage to utility equipment. Please contact your applicable utility (either SRP at 602
Install 8.91 kW DC roof-mounted PV system with (22) 405W Longi modules, (1) Tesla Powerwall 3 battery, Tesla Backup Switch
Install of 225A meter-main upgrade per plans.
New 24kw Gas Generator Installation of 24kw generator, sub panel, transfer switch, and dedicated gas line. Minimum required building inspections: Electric rough in and electric final, Gas rough in and gas pipe final, and final.
Installation of 13.50 kWh Battery and Main Panel Upgrade to 225A.
Tesla PW3 battery, retrofit to existing PV
Tesla PW3 battery, retrofit to existing PV
electrical
electrical
electrical
electrical
electrical
electrical
Tenant improvement to existing space (formerly CVS) for Dollar Tree. Scope includes updating finishes and fixtures New RTUs at existing locations and MEP work as needed.
Installation of EV Dual Charging Station pedestal mounted at building #6. Existing multifamily building. 2026-082927 DA.
BASE: Installing a backup battery system and additional meter socket.
EV charger
Installing a backup battery system and additional meter socket.
52 TEN Wall Sign
ETJ- TEMP POWER
Interior Remodel primary bath includes moving plumbing in slab remodel kitchen including moving appliances locations remove fireplace an open wall in kitchen add closet space in garage for primary closet area. (to be include in garage conversion app) Add door to create laundry room
BASE: Installing a backup battery system and additional meter socket.
New pool and spa at back of property
BASE: Installing a backup battery system and additional meter socket.
UFCU E01.1 East Elevation Illuminated (Duplicate Sign)
Emergency Repair of busbar/disconnect.
ETJ - electrical permit for a disconnect for AE for a generator installation