Search Permits
191,479 results
26-15540-RNVS Two-Family, Conversion from 4-plex to Two-Family. ADD 1013 Teche St New Orleans, LA 70114 KEEP 1015 Teche St New Orleans, LA 70114 RETIRE 1015 Teche St Apt 101 New Orleans, LA 70114 RETIRE 1015 Teche St Apt 102 New Orleans, LA 70114 RETIRE 1015 Teche St Apt 201 New Orleans, LA 70114 RETIRE 1015 Teche St Apt 202 New Orleans, LA 70114
Interior renovation of existing commercial support space to private office use. Scope includes minor reconfiguration of nonstructural partitions with associated drywall and interior paint, replacement of existing ceiling light fixtures, and new flooring. No structural, HVAC, or site work involved. NEED TO VERIFY: Approved plans indicate scope of work for upstairs area/unit 3907 only; DOWNSTAIRS/1ST LEVEL NOT IN SCOPE.
Add two outlets and extend four outlets
Install 100-amp temp pole. Edgar Young 813-0256
Demo to grade
Fire pump for Electrical permit, New construction, home,
22-09522-RNVN Single Family, Conversion from Duplex to Single Family. KEEP 2216 N Robertson St New Orleans, LA 70117 (AM11370935, 98201978) RETIRE 2218 N Robertson St New Orleans, LA 70117
Fire Change some circuits
Commercial tenant shell finish out for office use.
new electrical service and upgrade
ELECTRICAL SERVICE CHANGE AND UPGRADE
Meter Increase for 2- gas furnace, 1- tankless water heater, 1-clothes dryer, 1- 5 burner stove top, 2- gas lanterns on front porch
I am Jarrod Franklin, with Franklin Design LLC, a licensed contractor. We will be installing gutters all around the house, fixing a small roof repair where the shingles need replacing, 20-30 siding boards, and painting all siding.
Install new exterior door and sidelights in 1st floor North wall of 1427 Washington Ave. with brick landings and ramp at the door's exterior. Replace existing metal gate at Washington with new gate. No plumbing, no HVAC, no electrical. All work to be done as per plans.
VACANCY
25-15570-RNVS Three to Four family, 4-plex. HM Addition. ADD 7229 Zimpel St HM New Orleans, LA 70118
Electrical Vacancy Reconnect-Inspection and verification of existing electrical service for utility reconnection and re-energization.
Wiring new construction.
####TEST####
Add an electric meter to separate the power service from one existing suite to the other. To be done as per scope.
6-month vacancy
6 month electrical vacancy permit and inspection
Perform non-structural renovation shingle replacement, wire repair, HVAC, plumbing & electrical fixture updates, drywall, paint, trim and flooring.
Electrical service permit for Apt 405 at 4420 Dauphine St.
Electrical service permit for Apt 404 at 4420 Dauphine St.
Electrical service permit for Apt 403 at 4420 Dauphine St.
Electrical service permit for Apt 401 at 4420 Dauphine St.
Electrical service permit for Apt 407 at 4420 Dauphine St.
Electrical service permit for Apt 408 at 4420 Dauphine St.
Electrical service permit for Apt 410 at 4420 Dauphine St.